Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(Unaxis UP)
(deleted ASML update)
 
(48 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />


=====JEOL JBX-6300FS: Up=====
=====Suss SB6-8E=====
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
System is up and running reliably.// [[User:John_d|Demis D. John]] 09:07, 15 August 2024 (PDT)


-Aidan
=====Wafer Bonder, (Suss SB6-8E)=====
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)
A third party bonder repair company will be out here the week of the 26th. The goal is to install the new top heater and then to do a full PM. If all goes well the tool will be available to use late that week. I’ll send out another email once I have more information. Thanks, Aidan.

// [[User:John_d|Demis D. John]] 15:52, 6 August 2024 (PDT)

=====Unaxis ICP-PECVD is UP =====
Bill removed the broken wafer from the process chamber and cleaned the clamp. We ran a post dep clean with no errors. System is ready to use. --Lee
// [[User:John_d|Demis D. John]] 15:32, 15 August 2024 (PDT)


=====ICP1 Down=====
=====ICP1 Down=====

Latest revision as of 00:45, 7 November 2024

Suss SB6-8E

When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.

-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)