Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
Content deleted Content added
Mehalana v (talk | contribs) No edit summary |
mNo edit summary |
||
| (63 intermediate revisions by 3 users not shown) | |||
| Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
=====ECVD#2 will remain down overnight===== |
|||
Unfortunately PECVD2 will remain down overnight. |
|||
=====Christmas Lab Shutdown: Dec 22-25===== |
|||
The heater is unable to keep up with the setpoint while running. |
|||
Users, |
|||
To perform annual maintenance, we are planning to have the lab shut down from '''''9 am on Monday December 22 through 9 am Friday December 26th'''''. |
|||
| ⚫ | |||
Don and I replaced the heater controller without luck. |
|||
- Peder Lenvik |
|||
| ⚫ | |||
=====Announcements moved===== |
|||
I am cooling down the chamber overnight and we will look into the heater coil in the morning. |
|||
Please check the announcements in SignupMonkey for equipment notifications. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 03:31, 25 February 2025 (UTC) |
|||
| ⚫ | |||
=====RIE #5 Down===== |
|||
RIE #5 will be down Monday March 13th through the end of Wednesday March 15th for maintenance. |
|||
If we complete the job early we will send a follow-up email releasing the system. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 09:46, 21 February 2025 (UTC) |
|||
=====Olympus DSX Microscope: Down===== |
|||
After speaking with Olympus it looks like there is a problem with the polarizer that is interfering with basic system initialization. I'm waiting for the repair quote and will update everyone when we know more. |
|||
-- Tony Bosch |
|||
| ⚫ | |||
=====Stepper #3 (ASML DUV) - Maint moved to March 3rd===== |
|||
We have postponed the Periodic Maintenance (PM) to the week of Monday March 3rd. |
|||
| ⚫ | |||
| ⚫ | |||
=====Oxford ALD+Ion Mill: UP===== |
|||
The tool now runs all process temperatures (120-300c). |
|||
--Bill Millerski |
|||
UCSB |
|||
//[[User:John_d|Demis D. John]] 19:48, 4 February 2025 (UTC) |
|||
=====New Gowns: Toolbelts purchases===== |
|||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase. |
|||
Two vendors for cleanroom belts we are using are listed here, you may request others: |
|||
* [https://www.terrauniversal.com/tool-belt-pocket-49in-waist-white-altessa-grid-uniform-technology-4954-60a.html Uniform Technology Tool Belt] - note the waist size, the 49” belt fits up to ~36-38” waist. |
|||
* [https://www.fishersci.com/shop/products/cleanroom-fannypack-1-ea-white/NC0723118?searchHijack=true&searchTerm=cleanroom-fannypack-1-ea-white&searchType=Rapid&matchedCatNo=NC0723118 HiTEC Fannypack] |
|||
// [[User:John_d|Demis D. John]] 03:34, 3 January 2025 (UTC) |
|||
=====Suss SB6-8E===== |
|||
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests. |
|||
I will send out an update once we have one. |
|||
-Aidan |
|||
// [[User:John_d|Demis D. John]] 00:35, 8 December 2024 (UTC) |
|||
=====ICP1 Down===== |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
|||
<!-- |
<!-- |
||
Latest revision as of 06:39, 3 December 2025
Christmas Lab Shutdown: Dec 22-25
Users, To perform annual maintenance, we are planning to have the lab shut down from 9 am on Monday December 22 through 9 am Friday December 26th.
Please plan accordingly. - Peder Lenvik // Demis D. John 02:03, 27 November 2025 (UTC)
Announcements moved
Please check the announcements in SignupMonkey for equipment notifications. // Demis D. John 02:03, 27 November 2025 (UTC)