Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
Content deleted Content added
Mehalana v (talk | contribs) |
mNo edit summary |
||
| (10 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
=====MLA is down===== |
|||
After some troubleshooting and a bunch of back and forth with HIMT, we have concluded that there is a mechanical failure in the Z drive for the writehead. This will require the writehead to be replaced for which I do not have an ETA. I'll update everyone once I know more. |
|||
=====Christmas Lab Shutdown: Dec 22-25===== |
|||
-Lee |
|||
Users, |
|||
| ⚫ | |||
To perform annual maintenance, we are planning to have the lab shut down from '''''9 am on Monday December 22 through 9 am Friday December 26th'''''. |
|||
=====EBeam1 is UP===== |
|||
EBeam1 is back UP |
|||
Please plan accordingly. |
|||
Late this morning, the hoist motor was finally delivered, and as soon as it arrived I started the installation. |
|||
- Peder Lenvik |
|||
I then tested the Egun operation due to the new high voltage feed throughs that were installed earlier this week. |
|||
| ⚫ | |||
=====Announcements moved===== |
|||
All tests were completed without issue. System UP. |
|||
Please check the announcements in SignupMonkey for equipment notifications. |
|||
// 04:23, 25 July 2025 (UTC) |
|||
| ⚫ | |||
===== SignupMonkey + Wiki: Off-Campus Access===== |
|||
Due to a DDoS attack affecting the Signupmonkey server, we have restricted access to the website to US locations only, including both the Nanofab Wiki and Signupmonkey. |
|||
If you are off-campus and experiencing issues, please utilize the UCSB VPN to access our sites. Here are the installation instructions for VPN on your device. You will need your UCSB NetID for download and installation - you would have received a UCSB NetID when you started using the NanoFab: |
|||
https://it.ucsb.edu/ivanti-secure-access-campus-vpn/get-connected-campus-vpn |
|||
-- Vraj |
|||
| ⚫ | |||
=====Suss SB6-8E===== |
|||
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests. |
|||
I will send out an update once we have one. |
|||
-Aidan |
|||
// [[User:John_d|Demis D. John]] 00:35, 8 December 2024 (UTC) |
|||
=====ICP1 Down===== |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
|||
<!-- |
<!-- |
||
Latest revision as of 06:39, 3 December 2025
Christmas Lab Shutdown: Dec 22-25
Users, To perform annual maintenance, we are planning to have the lab shut down from 9 am on Monday December 22 through 9 am Friday December 26th.
Please plan accordingly. - Peder Lenvik // Demis D. John 02:03, 27 November 2025 (UTC)
Announcements moved
Please check the announcements in SignupMonkey for equipment notifications. // Demis D. John 02:03, 27 November 2025 (UTC)