Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
No edit summary
Line 16: Line 16:
The system is down. We are sourcing a replacement PCB.
The system is down. We are sourcing a replacement PCB.
[[User:Silva|Silva]] 10:20, 4 February 2019 (PST)
[[User:Silva|Silva]] 10:20, 4 February 2019 (PST)

===== ALD Metal Dep.
The system is down. A new turbo pump will be delivered in three weeks.
[[User:Silva|Silva]] 10:41, 4 February 2019 (PST)


<!---------- end of Equipment Status ------------>
<!---------- end of Equipment Status ------------>

Revision as of 18:41, 4 February 2019

Equipment Status

Suss Bonder

The system is down. We are waiting for fieldservce. Silva 10:18, 4 February 2019 (PST)

KLA Tencor Surfscan

The system is down. We are sourcing a replacement PCB. Silva 10:20, 4 February 2019 (PST)

===== ALD Metal Dep. The system is down. A new turbo pump will be delivered in three weeks. Silva 10:41, 4 February 2019 (PST)