Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Line 24: Line 24:
All of the damaged parts have been repaired and we should receive them next week. I'm hopeful we'll have the system running by Thursday or Friday. -- Tony
All of the damaged parts have been repaired and we should receive them next week. I'm hopeful we'll have the system running by Thursday or Friday. -- Tony
// [[User:John d|John d]] 15:05, 27 January 2023 (PST)
// [[User:John d|John d]] 15:05, 27 January 2023 (PST)

===== Suss Bonder SB6 Down =====
We have fixed the top heater issue and now need to run some pressure and voltage tests. The system will be available Monday late morning if everything looks good. I’ll send out an email once the tool is back up. -- Aidan
// [[User:John d|John d]] 13:48, 27 January 2023 (PST)


===== Dektak XT in qualification =====
===== Dektak XT in qualification =====

Revision as of 21:11, 4 February 2023

Important Announcements


MLA Service: Monday Jan 30th 5:30pm

The MLA will be down beginning on Monday 1/30 at 5:30 pm and the tool will be unavailable until around 5 pm the following day (Tuesday 1/31). HIMT needs to have Germany remote into the tool that evening to address the software issues we have been having. I will send an email out on Tuesday once the tool is available.

-Lee // John d 13:46, 27 January 2023 (PST)

Flip-Chip Bonder repair

All of the damaged parts have been repaired and we should receive them next week. I'm hopeful we'll have the system running by Thursday or Friday. -- Tony // John d 15:05, 27 January 2023 (PST)

Dektak XT in qualification

We have replaced the Dektak 6M with a new Dektak XT profilometer. We are currently qualifying the tool, we'll send an email when it's ready for training. // John d 10:39, 25 January 2023 (PST)

Blue-M oven: UP

Oven reassembled and tested. Now available for use. // John d 00:52, 27 January 2023 (PST)

Au Plating: DOWN

Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)

Oxford Cobra ICP Etch

ICP power supply has failed. We have requested a replacement from the vendor and a timeline for repair. Oxford will have an engineer here next week (mid week) with the hopes of getting the system operational again. With any luck the system will be released by Friday Feb. 3rd afternoon. // John d 15:03, 27 January 2023 (PST)