Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 14: Line 14:


===== KLA Tencor Surfscan =====
===== KLA Tencor Surfscan =====
The system is down. We are sourcing a replacement PCB.
The system is down. The vendor has located a replacement PCB. Once the board is secured, the vendor will schedule a visit and finish the system repairs.
[[User:Silva|Silva]] 10:20, 4 February 2019 (PST)
[[User:Silva|Silva]] 21:51, 11 February 2019 (PST)


===== ALD Metal Dep =====
===== ALD Metal Dep =====
Line 22: Line 22:


===== E-Beam#1 =====
===== E-Beam#1 =====
The E-Beam#1 power supply and control upgrade started today. We hope to complete the process within 10 business days. We will keep you posted as progress is made.
The system is down. The E-Beam#1 power supply and control upgrade started today. We hope to complete the process within 10 business days. We will keep you posted as progress is made.
[[User:Silva|Silva]] 21:45, 11 February 2019 (PST)
[[User:Silva|Silva]] 21:45, 11 February 2019 (PST)


===== Vapor HF Etch =====
===== Vapor HF Etch =====
The HF bottle is empty. The bottle will be replaced Wednesday February 13th.
The system is down. The HF bottle is empty. The bottle will be replaced Wednesday February 13th.
[[User:Silva|Silva]] 21:45, 11 February 2019 (PST)
[[User:Silva|Silva]] 21:45, 11 February 2019 (PST)



Revision as of 05:51, 12 February 2019

Equipment Status

Suss Bonder

The system is down. We are waiting for fieldservce. Silva 10:18, 4 February 2019 (PST)

KLA Tencor Surfscan

The system is down. The vendor has located a replacement PCB. Once the board is secured, the vendor will schedule a visit and finish the system repairs. Silva 21:51, 11 February 2019 (PST)

ALD Metal Dep

The system is down. A turbo pump has been sourced, and should be here Thursday February 14th. Silva 21:45, 11 February 2019 (PST)

E-Beam#1

The system is down. The E-Beam#1 power supply and control upgrade started today. We hope to complete the process within 10 business days. We will keep you posted as progress is made. Silva 21:45, 11 February 2019 (PST)

Vapor HF Etch

The system is down. The HF bottle is empty. The bottle will be replaced Wednesday February 13th. Silva 21:45, 11 February 2019 (PST)