Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 18: | Line 18: | ||
===== FEI SEM is DOWN ===== |
===== FEI SEM is DOWN ===== |
||
The replacement tip has been installed |
The replacement tip has been installed the system is up for lower mag imaging (<50k). FEI will be back early next week to install a brand new tip. The service should take approximately 3 days to complete. |
||
[[User:Hopkins a|Hopkins a]] 16:54, 26 March 2019 (PDT) |
[[User:Hopkins a|Hopkins a]] 16:54, 26 March 2019 (PDT) |
||
Revision as of 19:32, 5 April 2019
Equipment Status
Suss Bonder
Suss fieldservice found several issues with the system. Suss will evaluate the issues and recommend possible solutions. // Silva 21:36, 13 February 2019 (PST)
GCA Autostep 200 Maintenance
There is a problem with the RMS power supply. The vendor is having a new supply shipped overnight to replace the failing unit. The system will be down until 5:00 pm tomorrow afternoon. Silva 15:40, 4 April 2019 (PDT)
FEI SEM is DOWN
The replacement tip has been installed the system is up for lower mag imaging (<50k). FEI will be back early next week to install a brand new tip. The service should take approximately 3 days to complete. Hopkins a 16:54, 26 March 2019 (PDT)