Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 12: | Line 12: | ||
The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. |
The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. |
||
[[User:Silva|Silva]] 15:04, 19 November 2019 (PST) |
[[User:Silva|Silva]] 15:04, 19 November 2019 (PST) |
||
===== Cleanroom Shutdown on 11/21 ===== |
|||
The cleanroom will be closed from 7-9am on Thursday, November 21st for fire system testing. No one will be allowed in the lab during this time. Please plan accordingly. |
|||
[[User:Hopkins a|Hopkins a]] 15:44, 6 November 2019 (PST) |
|||
===== Suss Bonder ===== |
===== Suss Bonder ===== |
Revision as of 16:15, 25 November 2019
Equipment Status
Unaxis ICP-PECVD
The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. Silva 15:04, 19 November 2019 (PST)
Suss Bonder
Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. Silva 11:16, 25 October 2019 (PDT)