Template:Announcements

From UCSB Nanofab Wiki
Revision as of 15:04, 8 October 2019 by Silva (talk | contribs)
Jump to navigation Jump to search

Equipment Status

ASML Stepper #3: DOWN

Failure of the Temperature Control Unit on the ASML. This unit controls the lens and stage temperatures among other things. Please see emails for updates. // John d 13:15, 4 October 2019 (PDT)


Suss Bonder

Suss Bonder is DOWN. The vendor installed all the hardware but failed to get the software to work. The vendor will be back sometime next week, the week of the 16th, to complete the repair/upgrade. Silva 15:59, 13 September 2019 (PDT)