Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
Line 12: | Line 12: | ||
Suss fieldservice found several issues with the system. Suss will evaluate the issues and recommend possible solutions. |
Suss fieldservice found several issues with the system. Suss will evaluate the issues and recommend possible solutions. |
||
// [[User:Silva|Silva]] 21:36, 13 February 2019 (PST) |
// [[User:Silva|Silva]] 21:36, 13 February 2019 (PST) |
||
− | |||
− | ===== GCA Autostep 200 Maintenance ===== |
||
− | There is a problem with the RMS power supply. The vendor is having a new supply shipped overnight to replace the failing unit. The system will be down until 5:00 pm tomorrow afternoon. |
||
− | [[User:Silva|Silva]] 15:40, 4 April 2019 (PDT) |
||
===== FEI SEM is DOWN ===== |
===== FEI SEM is DOWN ===== |
Revision as of 16:28, 5 April 2019
Equipment Status
Suss Bonder
Suss fieldservice found several issues with the system. Suss will evaluate the issues and recommend possible solutions. // Silva 21:36, 13 February 2019 (PST)
FEI SEM is DOWN
The replacement tip has been installed the system is up for lower mag imaging (<50k). FEI will be back early next week to install a brand new tip. The service should take approximately 3 days to complete. Hopkins a 16:54, 26 March 2019 (PDT)