Difference between revisions of "Template:Announcements"
Mehalana v (talk | contribs) |
Mehalana v (talk | contribs) |
||
(10 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
− | =====Atomic Force Microscope (Dimension ICON) - 05/17: System UP===== |
||
− | Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder! |
||
⚫ | |||
⚫ | |||
+ | JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed. |
||
⚫ | |||
⚫ | |||
− | We have received the replacement motor for the TSA Y axis. The FSE will be onsite Monday June 3rd to work on the tool. |
||
+ | =====(JEOL JBX-6300FS) System is UP===== |
||
− | The tool remains up for backside alignment and topside exposures that do not require alignment. |
||
⚫ | |||
+ | |||
+ | =====MLA Maintenance 6/24-6/27===== |
||
+ | The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the |
||
+ | evenings. |
||
-Lee |
-Lee |
||
− | // |
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
⚫ | |||
⚫ | |||
+ | =====Stepper #1 (GCA 6300) - Tool availability===== |
||
⚫ | |||
+ | Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times: |
||
+ | 6-18-24 at 8:00am |
||
− | =====Stepper #3 (ASML DUV) - Pneumatics repaired, extra day for optics===== |
||
+ | Till |
||
− | We were able to repair the pneumatics issue and are currently running reticle and wafer reproducability runs overnight to exercise/test the system. |
||
+ | 6-20-24 at 5:00pm |
||
+ | Please plan your processing activities accordingly. |
||
− | Consequently the optics was only started today, so will take one day longer than planned - we will extend this visit to Thursday to complete the work. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
||
+ | =====Stepper #2 (GCA Autostep 200) - Tool availability===== |
||
− | Sorry for the inconvenience. |
||
+ | Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times: |
||
+ | 6-21-24 at 8:00am |
||
⚫ | |||
+ | Till |
||
+ | 6-21-24 at 5:00pm |
||
+ | |||
+ | Please plan your processing activities accordingly. |
||
+ | |||
+ | Thanks |
||
+ | Bill Millerski |
||
+ | UCSB |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
||
+ | |||
⚫ | |||
⚫ | |||
+ | |||
⚫ | |||
=====ICP1 Down===== |
=====ICP1 Down===== |
||
Line 33: | Line 52: | ||
=====Lab Access Changes: Symmetry App===== |
=====Lab Access Changes: Symmetry App===== |
||
The iris scanner has been decommissioned. Please use the card reader which supports: |
The iris scanner has been decommissioned. Please use the card reader which supports: |
||
+ | |||
-Physical card |
-Physical card |
||
+ | |||
-Mobile phone via Symmetry App |
-Mobile phone via Symmetry App |
||
− | // |
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
=====Wafer Bonder, (Suss SB6-8E)===== |
=====Wafer Bonder, (Suss SB6-8E)===== |
Latest revision as of 17:01, 14 June 2024
MA6 is up
JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed.
//Vraj Mehalana 16:59, 14 June 2024 (PDT)
(JEOL JBX-6300FS) System is UP
//Vraj Mehalana 16:59, 14 June 2024 (PDT)
MLA Maintenance 6/24-6/27
The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the evenings. -Lee //Vraj Mehalana 16:59, 14 June 2024 (PDT)
Stepper #1 (GCA 6300) - Tool availability
Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:
6-18-24 at 8:00am Till 6-20-24 at 5:00pm
Please plan your processing activities accordingly. //Vraj Mehalana 16:59, 14 June 2024 (PDT)
Stepper #2 (GCA Autostep 200) - Tool availability
Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:
6-21-24 at 8:00am Till 6-21-24 at 5:00pm
Please plan your processing activities accordingly.
Thanks Bill Millerski UCSB //Vraj Mehalana 16:59, 14 June 2024 (PDT)
Velion FIB Tool DOWN
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
//Vraj Mehalana 10:58, 30 April 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)