Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
=====EBeam4 Update - Still down=====
 
EBeam4 will remain down overnight.
 
   
 
=====MA6 is up=====
The new motor arrived as well as the new junction box and new cables.
 
  +
JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed.
   
 
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
I removed the old junction box/plugs due to a lot of corrosion inside the box caused by it being located directly under the water supply lines.
 
   
  +
=====(JEOL JBX-6300FS) System is UP=====
This corrosion inside the box could have contributed to the failure of the old motor.
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
I installed the new motor, ran all new cables to the new junction box in it's new location away from the water lines.
 
   
  +
=====MLA Maintenance 6/24-6/27=====
I was able to test the function of the hoist by raising and lowering the bell jar while in manual mode.
 
  +
The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the
  +
evenings.
 
-Lee
 
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
   
For safety reasons, I had the machine powered off during the duration of the work being done, so the cryo will be in regen overnight.
 
   
  +
=====Stepper #1 (GCA 6300) - Tool availability=====
Tomorrow morning I will continue testing the system to ensure everything is working properly before I release the tool.
 
  +
Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:
   
  +
6-18-24 at 8:00am
I will send another email when an update is available.
 
  +
Till
  +
6-20-24 at 5:00pm
   
  +
Please plan your processing activities accordingly.
//10:36, 30 May 2024 (PDT)
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
   
=====Stepper #3 (ASML DUV) - System UP and calibrated=====
+
=====Stepper #2 (GCA Autostep 200) - Tool availability=====
  +
Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:
We have finished calibrations,
 
System is up.
 
   
  +
6-21-24 at 8:00am
Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose.
 
  +
Till
//[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT)
 
  +
6-21-24 at 5:00pm
   
  +
Please plan your processing activities accordingly.
=====Unaxis VLR still Down=====
 
   
  +
Thanks
The chiller has a decent sized ball of ice inside of it.
 
  +
Bill Millerski
 
  +
UCSB
I need to let that melt off before I can do a proper diagnosis of what is causing the high pressure cut off to trip when the refrigerant pressures seem normal.
 
//13:29, 1 June 2024 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
 
//[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT)
 
 
=====Atomic Force Microscope (Dimension ICON) - 05/17: System UP=====
 
Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!
 
 
//[[User:Mehalana v|Vraj Mehalana]] 13:46, 20 May 2024 (PDT)
 
 
=====MA6 TSA is down - Update=====
 
Due to unforeseen circumstances our FSE will not be onsite next week to work on the TSA microscope. They have rescheduled with us for Thursday of the following week, 6/13. I apologize for the inconvenience.
 
 
Per my previous email, there is a MA6 available for use at CNSI. Here is a link to the webpage for their tools:
 
 
https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication
 
 
-Lee
 
//15:59, 22 May 2024 (PDT)
 
   
 
=====Velion FIB Tool DOWN=====
 
=====Velion FIB Tool DOWN=====
Line 68: Line 57:
 
-Mobile phone via Symmetry App
 
-Mobile phone via Symmetry App
   
//10:54, 23 May 2024 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
   
 
=====Wafer Bonder, (Suss SB6-8E)=====
 
=====Wafer Bonder, (Suss SB6-8E)=====

Latest revision as of 17:01, 14 June 2024

MA6 is up

JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed.

//Vraj Mehalana 16:59, 14 June 2024 (PDT)

(JEOL JBX-6300FS) System is UP

//Vraj Mehalana 16:59, 14 June 2024 (PDT)

MLA Maintenance 6/24-6/27

The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the evenings. -Lee //Vraj Mehalana 16:59, 14 June 2024 (PDT)


Stepper #1 (GCA 6300) - Tool availability

Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:

6-18-24 at 8:00am Till 6-20-24 at 5:00pm

Please plan your processing activities accordingly. //Vraj Mehalana 16:59, 14 June 2024 (PDT)

Stepper #2 (GCA Autostep 200) - Tool availability

Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:

6-21-24 at 8:00am Till 6-21-24 at 5:00pm

Please plan your processing activities accordingly.

Thanks Bill Millerski UCSB //Vraj Mehalana 16:59, 14 June 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)