Difference between revisions of "Template:Announcements"
Mehalana v (talk | contribs) |
Mehalana v (talk | contribs) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
⚫ | |||
− | EBeam4 is back up. |
||
⚫ | |||
− | The overnight regen of the cryo was completed this morning. |
||
+ | JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed. |
||
− | I then tested the operation of the hoist numerous times without issue. |
||
− | I tested the EBeam by running 200A of Ti without issue. |
||
⚫ | |||
− | System UP |
||
+ | |||
+ | =====(JEOL JBX-6300FS) System is UP===== |
||
+ | |||
⚫ | |||
+ | |||
+ | =====MLA Maintenance 6/24-6/27===== |
||
+ | The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the |
||
+ | evenings. |
||
⚫ | |||
⚫ | |||
− | //10:36, 30 May 2024 (PDT) |
||
=====Stepper #1 (GCA 6300) - Tool availability===== |
=====Stepper #1 (GCA 6300) - Tool availability===== |
||
Line 19: | Line 25: | ||
Please plan your processing activities accordingly. |
Please plan your processing activities accordingly. |
||
− | // |
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
=====Stepper #2 (GCA Autostep 200) - Tool availability===== |
=====Stepper #2 (GCA Autostep 200) - Tool availability===== |
||
Line 33: | Line 39: | ||
Bill Millerski |
Bill Millerski |
||
UCSB |
UCSB |
||
− | // |
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
− | |||
− | =====Stepper #3 (ASML DUV) - System UP and calibrated===== |
||
− | We have finished calibrations, |
||
− | System is up. |
||
− | |||
− | Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose. |
||
⚫ | |||
− | |||
− | =====Unaxis VLR still Down===== |
||
− | |||
− | The chiller has a decent sized ball of ice inside of it. |
||
− | |||
− | I need to let that melt off before I can do a proper diagnosis of what is causing the high pressure cut off to trip when the refrigerant pressures seem normal. |
||
− | //13:29, 1 June 2024 (PDT) |
||
− | |||
⚫ | |||
− | |||
− | =====Atomic Force Microscope (Dimension ICON) - 05/17: System UP===== |
||
− | Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder! |
||
− | |||
⚫ | |||
− | |||
− | =====MA6 TSA is down - Update===== |
||
− | Due to unforeseen circumstances our FSE will not be onsite next week to work on the TSA microscope. They have rescheduled with us for Thursday of the following week, 6/13. I apologize for the inconvenience. |
||
− | |||
− | Per my previous email, there is a MA6 available for use at CNSI. Here is a link to the webpage for their tools: |
||
− | |||
− | https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication |
||
− | |||
⚫ | |||
− | //15:59, 22 May 2024 (PDT) |
||
=====Velion FIB Tool DOWN===== |
=====Velion FIB Tool DOWN===== |
||
Line 82: | Line 57: | ||
-Mobile phone via Symmetry App |
-Mobile phone via Symmetry App |
||
− | // |
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
=====Wafer Bonder, (Suss SB6-8E)===== |
=====Wafer Bonder, (Suss SB6-8E)===== |
Latest revision as of 17:01, 14 June 2024
MA6 is up
JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed.
//Vraj Mehalana 16:59, 14 June 2024 (PDT)
(JEOL JBX-6300FS) System is UP
//Vraj Mehalana 16:59, 14 June 2024 (PDT)
MLA Maintenance 6/24-6/27
The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the evenings. -Lee //Vraj Mehalana 16:59, 14 June 2024 (PDT)
Stepper #1 (GCA 6300) - Tool availability
Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:
6-18-24 at 8:00am Till 6-20-24 at 5:00pm
Please plan your processing activities accordingly. //Vraj Mehalana 16:59, 14 June 2024 (PDT)
Stepper #2 (GCA Autostep 200) - Tool availability
Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:
6-21-24 at 8:00am Till 6-21-24 at 5:00pm
Please plan your processing activities accordingly.
Thanks Bill Millerski UCSB //Vraj Mehalana 16:59, 14 June 2024 (PDT)
Velion FIB Tool DOWN
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
//Vraj Mehalana 10:58, 30 April 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)