=====Dicing Saw Service Visit=====
 
The dicing saw will be receiving its annual PM this Thursday beginning at 8am. The FSE will also be looking into the theta rotation issue, so it is possible the work could extend into Friday. I will send out an update email sometime Thursday afternoon as to the status of the tool.
 
   
  +
=====Stepper #3 (ASML DUV) - Tool down=====
-Lee
 
  +
Wafer stage positioning laser is dying, Asml engineers will be on site Monday and Tuesday to repair. We have the replacement already on hand.
   
//[[User:Mehalana v|Vraj Mehalana]] 10:23, 8 July 2024 (PDT)
+
Unfortunately, we cannot initialize the stage at this time. System is down. // [[User:Mehalana v|Vraj Mehalana]] 18:36, 3 October 2024 (PDT)
=====Dicing Saw Service Visit=====
 
The dicing saw will be receiving its annual PM this Thursday beginning at 8am. The FSE will also be looking into the theta rotation issue, so it is possible the work could extend into Friday. I will send out an update email sometime Thursday afternoon as to the status of the tool.
 
   
 
=====MLA Service Complete=====
-Lee
 
  +
The FSE has completed their work.
   
  +
I ran beam offset checks on both lasers prior to the maintenance and found that the Y axis value for the 405 laser was off by ~0.6 µm. I made the necessary change and ran another check with all values in spec. I also ran beam offset checks on both laser post maintenance along with an overlay exposure and all looked good.
//[[User:Mehalana v|Vraj Mehalana]] 10:23, 8 July 2024 (PDT)
 
=====Velion FIB Tool DOWN=====
 
Raith service have completed the source change, resolved the power supply and column alignment issues, and restored the Pt deposition capability to full capacity. With remote assistance from Raith I will run some calibrations and stability tests over the next few days. After that I will return the tool to general use towards the end of the week.
 
   
  +
Tool is available to use.
The new ion source is AuGeSi. We have no plans to return to GaBiLi for the foreseeable future. Please get in contact if you have any questions.
 
   
  +
-Lee // [[User:John_d|Demis D. John]] 17:46, 2 October 2024 (PDT)
-Dan
 
   
 
=====Suss SB6-8E=====
//[[User:Mehalana v|Vraj Mehalana]] 10:23, 8 July 2024 (PDT)
 
  +
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
  +
  +
-Aidan
 
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)
   
 
=====ICP1 Down=====
 
=====ICP1 Down=====
Line 33: Line 33:
   
 
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
 
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
 
=====Wafer Bonder, (Suss SB6-8E)=====
 
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
 
   
 
<!--
 
<!--

Latest revision as of 18:36, 3 October 2024

Stepper #3 (ASML DUV) - Tool down

Wafer stage positioning laser is dying, Asml engineers will be on site Monday and Tuesday to repair. We have the replacement already on hand.

Unfortunately, we cannot initialize the stage at this time. System is down. // Vraj Mehalana 18:36, 3 October 2024 (PDT)

MLA Service Complete

The FSE has completed their work.

I ran beam offset checks on both lasers prior to the maintenance and found that the Y axis value for the 405 laser was off by ~0.6 µm. I made the necessary change and ran another check with all values in spec. I also ran beam offset checks on both laser post maintenance along with an overlay exposure and all looked good.

Tool is available to use.

-Lee // Demis D. John 17:46, 2 October 2024 (PDT)

Suss SB6-8E

When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.

-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)