Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Line 12: Line 12:
<!------------- Announcements ---------------->
<!------------- Announcements ---------------->
===== Announcements =====
===== Announcements =====
// The NanoFab will be open at noon, Monday Dec 11.
// The NanoFab is Open.


// The [http://countyofsb.org/thomasfire.sbc Thomas Fire] has caused repeated power outages since the evening of Monday 12/4. CalFire is posting updates on [http://www.fire.ca.gov/current_incidents/incidentdetails/Index/1922 their webpage] and [https://www.facebook.com/CALFIRE FaceBook page].
// The [http://countyofsb.org/thomasfire.sbc Thomas Fire] has caused repeated power outages since the evening of Monday 12/4. CalFire is posting updates on [http://www.fire.ca.gov/current_incidents/incidentdetails/Index/1922 their webpage] and [https://www.facebook.com/CALFIRE FaceBook page].

Revision as of 00:31, 12 December 2017

Announcements

// The NanoFab is Open.

// The Thomas Fire has caused repeated power outages since the evening of Monday 12/4. CalFire is posting updates on their webpage and FaceBook page.

// Posted: 13:07, 11 December 2017 (PST)

Panasonic ICP #1

Pump failed. Don is installing a replacement. // Posted: 15:06, 7 December 2017 (PST)

GCA 6300 Stepper #1

Lamp power supply failure. Replacement is being shipped. // Posted: 15:06, 7 December 2017 (PST)

Cary 500

UV-Vis Detector Failure. Locating replacement. // Posted: 15:06, 7 December 2017 (PST)