Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
(addd lab shutdown, remove ASML) |
m (deleted lab shutdown) |
||
Line 11: | Line 11: | ||
<!----------------------------------------------> |
<!----------------------------------------------> |
||
<!------------- Equipment Status ----------------> |
<!------------- Equipment Status ----------------> |
||
===== Lab Shutdown: Sat. Aug. 22nd morning ===== |
|||
The cleanroom will be closed for the morning shift this Saturday to allow for FM to run some tests on our emergency generator. The lab will open back up at 1:15pm. We will have to shutdown and start up the majority of the tools so any piece of equipment with a cryo pump (ebeam #1, #2, #4, etc) will be down until late in the afternoon. Staff will send out updates on the systems that will need time to recover. Please plan accordingly. |
|||
// [[User:Hopkins a|Hopkins a]] 06:00, 19 August 2020 (PDT) |
|||
===== NanoFab COVID Response ===== |
===== NanoFab COVID Response ===== |
Revision as of 20:33, 24 August 2020
Equipment Status
NanoFab COVID Response
Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.
Contact the Lab Director for more information.
// John d 15:00, 19 July 2020 (PDT)
New Tool Installations
See the News Feed for info on two upcoming tool installations! We have a Raith Velion FIB and a Heidelberg MLA150 Maskless Aligner on the way.
// John d 17:48, 2 June 2020 (PDT)
Unaxis ICP-PECVD
The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only.
// Thibeault 14:22, 26 March 2020 (PDT)