Template:Announcements: Difference between revisions
(added NanoFab job openings) |
(ASML maint) |
||
Line 13: | Line 13: | ||
<!----------------------------------------------> |
<!----------------------------------------------> |
||
<!------------- Equipment Status ----------------> |
<!------------- Equipment Status ----------------> |
||
===== ASML Maintenance: Nov 1st-4th ===== |
|||
ASML Engineers will be on site for the periodic maintenance from November 1 through November 4. |
|||
System will be down during this time. |
|||
// [[User:John d|John d]] 16:23, 17 October 2022 (PDT) |
|||
===== Thermal Evap #1: DOWN ===== |
===== Thermal Evap #1: DOWN ===== |
Revision as of 23:23, 17 October 2022
Important Announcements
ASML Maintenance: Nov 1st-4th
ASML Engineers will be on site for the periodic maintenance from November 1 through November 4. System will be down during this time. // John d 16:23, 17 October 2022 (PDT)
Thermal Evap #1: DOWN
We are waiting for parts to come in to complete the repair on the Bell Jar hoist. We will notify once the system becomes available for use. // John d 17:06, 3 October 2022 (PDT)
E-Beam#2: Heater Down
EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)
MLA 150 Service & Software Revision
The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. // L Sawyer 13:32, 04 October 2022 (PDT)
ASML Up; Network status
Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested.
// John d 15:44, 29 September 2022 (PDT)
NanoFab Job Openings
The NanoFab has current job openings, apply at: NanoFab Job Postings
// John d 23:55, 4 October 2022 (PDT)