Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
<startfeed />
<startfeed />

=====(JEOL JBX-6300FS) - 06/13: System still DOWN=====
JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed.

//17:15, 13 June 2024 (PDT)~

=====MLA Maintenance 6/24-6/27=====
=====MLA Maintenance 6/24-6/27=====
The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the
The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the
Line 6: Line 12:
//15:59, 4 June 2024 (PDT)
//15:59, 4 June 2024 (PDT)


=====EBeam4 is up=====
EBeam4 is back up.

The overnight regen of the cryo was completed this morning.
I then tested the operation of the hoist numerous times without issue.
I tested the EBeam by running 200A of Ti without issue.

System UP

//10:36, 30 May 2024 (PDT)


=====Stepper #1 (GCA 6300) - Tool availability=====
=====Stepper #1 (GCA 6300) - Tool availability=====
Line 41: Line 37:
//13:32, 1 June 2024 (PDT)
//13:32, 1 June 2024 (PDT)


=====Stepper #3 (ASML DUV) - System UP and calibrated=====
We have finished calibrations,
System is up.

Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose.
//[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT)

=====Unaxis VLR still Down=====

The chiller has a decent sized ball of ice inside of it.

I need to let that melt off before I can do a proper diagnosis of what is causing the high pressure cut off to trip when the refrigerant pressures seem normal.
//13:29, 1 June 2024 (PDT)

//[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT)

=====Atomic Force Microscope (Dimension ICON) - 05/17: System UP=====
Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!

//[[User:Mehalana v|Vraj Mehalana]] 13:46, 20 May 2024 (PDT)

=====MA6 TSA is down - Update=====
Due to unforeseen circumstances our FSE will not be onsite next week to work on the TSA microscope. They have rescheduled with us for Thursday of the following week, 6/13. I apologize for the inconvenience.

Per my previous email, there is a MA6 available for use at CNSI. Here is a link to the webpage for their tools:

https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication

-Lee
//15:59, 22 May 2024 (PDT)


=====Velion FIB Tool DOWN=====
=====Velion FIB Tool DOWN=====

Revision as of 00:15, 14 June 2024

(JEOL JBX-6300FS) - 06/13: System still DOWN

JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed.

//17:15, 13 June 2024 (PDT)~

MLA Maintenance 6/24-6/27

The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the evenings. -Lee //15:59, 4 June 2024 (PDT)


Stepper #1 (GCA 6300) - Tool availability

Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:

6-18-24 at 8:00am Till 6-20-24 at 5:00pm

Please plan your processing activities accordingly. //13:32, 1 June 2024 (PDT)

Stepper #2 (GCA Autostep 200) - Tool availability

Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:

6-21-24 at 8:00am Till 6-21-24 at 5:00pm

Please plan your processing activities accordingly.

Thanks Bill Millerski UCSB //13:32, 1 June 2024 (PDT)


Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//10:54, 23 May 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)