Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
 
(414 intermediate revisions by 7 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!-- Description of the RSS feed -->
 
'''''Equipment Status'''''
 
----
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
 
   
  +
=====MA6 is up=====
Please use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
 
  +
JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed.
-->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
===== Cleanroom Down This Thursday (4/15)=====
 
   
  +
=====(JEOL JBX-6300FS) System is UP=====
The lab will be down for maintenance from 12:50pm to 2pm on Thursday, April 15th.
 
   
[[User:Hopkins a|Hopkins a]] 11:14, 12 April 2021 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
   
===== GCA 6300 April Service =====
+
=====MLA Maintenance 6/24-6/27=====
  +
The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the
  +
evenings.
  +
-Lee
  +
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
   
The vendor will be here to service the GCA 6300 starting Friday April 16, 2021 at 8:00am. The service will be finished Monday April 19, 2021 after calibration is completed. The system will not be available in the evenings during this time.
 
   
  +
=====Stepper #1 (GCA 6300) - Tool availability=====
[[User:Silva|Silva]] 07:25, 24 March 2021 (PDT)
 
  +
Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:
   
  +
6-18-24 at 8:00am
===== GCA Autostep April Service =====
 
  +
Till
  +
6-20-24 at 5:00pm
   
  +
Please plan your processing activities accordingly.
The vendor will be here April 19, 2021 to service the GCA Autostep. The service will start at 8:00am and will finish by early afternoon.
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
   
 
=====Stepper #2 (GCA Autostep 200) - Tool availability=====
[[User:Silva|Silva]] 07:25, 24 March 2021 (PDT)
 
  +
Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:
   
  +
6-21-24 at 8:00am
===== Weekly Testing strongly urged for UCSB Students/Staff =====
 
  +
Till
Free weekly COVID testing is available to UCSB Staff, Faculty and Students. UCSB employees are strongly urged to sign up for weekly testing, which takes only minutes, is administered on-campus and is free of charge.
 
  +
6-21-24 at 5:00pm
   
  +
Please plan your processing activities accordingly.
Weekly recurring appointments can be made as follows:
 
* Log on to the [https://studenthealthoc.sa.ucsb.edu/login_dualauthentication.aspx '''UCSB Testing Patient Portal'''] using your UCSB NetID and password.
 
* Select “''Appointments''” and then select “''COVID-19 Services''.”
 
* Select “''I need to schedule my weekly COVID-19 testing''” and answer the questions.
 
* Select an available date and time and click “''Continue''.”
 
* Confirm your appointment date and time and then click “''Schedule''.”
 
** Note: You must click “''Schedule''” or your appointment will not be confirmed. Also, be sure to add the appointment time and location to your calendar.
 
   
  +
Thanks
The Chancellor's [https://chancellor.ucsb.edu/memos/2020-10-15-recommended-covid-19-asymptomatic-campus-testing-program-faculty-staff-and memo to campus with details can be found here].
 
  +
Bill Millerski
// [[User:John d|John d]] 06:20, 16 November 2020 (PST)
 
  +
UCSB
  +
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
   
===== UCSB Flu Vaccination Mandate =====
+
=====Velion FIB Tool DOWN=====
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
UCSB Students, Staff and Faculty are required to recieve a Flu Vaccine by Nov. 1st. <br>Please see the '''[[COVID-19_User_Policies#UCSB_Flu_Vaccination_Mandate|COVID19 Page]]''' for relevant links and information.
 
// [[User:John d|John d]] 19:47, 13 October 2020 (PDT)
 
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
===== NanoFab COVID Protocols =====
 
Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.
 
   
  +
=====ICP1 Down=====
Contact the [[Brian Thibeault|Lab Director]] for more information.
 
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
  +
=====Lab Access Changes: Symmetry App=====
''The most recent COVID Protocols can be found at '''[[COVID-19_User_Policies]]'''.''
 
  +
The iris scanner has been decommissioned. Please use the card reader which supports:
   
  +
-Physical card
// [[User:John d|John d]] 15:00, 19 July 2020 (PDT)
 
   
  +
-Mobile phone via Symmetry App
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
<!---------- end of Equipment Status ------------>
 
  +
<!---------------------------------------------->
 
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
  +
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
  +
In order for your post to show up correctly, you need to:
 
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
  +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
<!--------------------------------------------
 
====== HOW TO ADD ITEMS ======
 
 
 
 
====== HOW TO ADD NEWS ITEMS ======
 
 
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
+
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
   
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
+
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
+
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
   
   
Line 84: Line 89:
 
===== NanoFab making LN2 icecream =====
 
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
// ~~~~
 
   
 
************* (end of example) **************
 
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
+
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
 
---------------------------------------------->
 
---------------------------------------------->

Latest revision as of 17:01, 14 June 2024

MA6 is up

JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed.

//Vraj Mehalana 16:59, 14 June 2024 (PDT)

(JEOL JBX-6300FS) System is UP

//Vraj Mehalana 16:59, 14 June 2024 (PDT)

MLA Maintenance 6/24-6/27

The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the evenings. -Lee //Vraj Mehalana 16:59, 14 June 2024 (PDT)


Stepper #1 (GCA 6300) - Tool availability

Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:

6-18-24 at 8:00am Till 6-20-24 at 5:00pm

Please plan your processing activities accordingly. //Vraj Mehalana 16:59, 14 June 2024 (PDT)

Stepper #2 (GCA Autostep 200) - Tool availability

Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:

6-21-24 at 8:00am Till 6-21-24 at 5:00pm

Please plan your processing activities accordingly.

Thanks Bill Millerski UCSB //Vraj Mehalana 16:59, 14 June 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)