Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(Feed Appended)
 
(176 intermediate revisions by 6 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
None
 
=====Filmetrics F50: UP=====
 
The F50-WaferMapper’s laptop has been Replaced.
 
// [[User:Mehalana v|Vraj Mehalana]] 16:53, 22 March 2023 (PDT)
 
   
=====FEI SEM#1 Replacement Project=====
+
=====Velion FIB Tool DOWN=====
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
The FEI SEM #1 will be removed and replaced starting Friday March 17th. Both SEMs will be shut down and the SEM room will be off limits beginning at 8 am Friday and return to normal operations Tuesday morning the 21st.
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:55, 16 March 2023 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
<!-- Description of the RSS feed -->
 
 
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
The iris scanner has been decommissioned. Please use the card reader which supports:
  +
  +
-Physical card
  +
  +
-Mobile phone via Symmetry App
  +
 
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
  +
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
  +
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 16: Line 29:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
===== Unaxis Etch: Down =====
 
We had to take the VAT controller off of this module to get the ICP-PECVD running. I have no immediate ETA for this system coming back online. Until we get this system running again you will need to use the Oxford Cobra system. -- Tony
 
// [[User:John d|John d]] 09:35, 13 February 2023 (PST)
 
 
===== Dektak XT ready for training =====
 
We have replaced the Dektak 6M with a new Dektak XT profilometer. The system is available for training, please [[Aidan_Hopkins|contact the tool supervisor]].
 
// [[User:John d|John d]] 10:08, 7 February 2023 (PST)
 
 
===== Au Plating: UP=====
 
only the full 100mm wafer fixture is available at the moment. You can plate smaller pieces on it with no issues.
 
// [[User:Mehalana v|Vraj Mehalana]] 12:35, 15 March 2023 (PDT)
 
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />
Line 37: Line 34:
 
<!--------------------------------------------
 
<!--------------------------------------------
 
====== HOW TO ADD ITEMS ======
 
====== HOW TO ADD ITEMS ======
 
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)

Latest revision as of 15:07, 27 June 2024

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)