Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
 
(166 intermediate revisions by 6 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
=====Flip-Chip Bonder, (Finetech) - Update=====
 
Finetech will be on-site Monday late morning or early afternoon to work on our system.
 
//[[User:Mehalana v|Vraj Mehalana]] 10:35, 3 May 2023 (PDT)
 
=====Plasma Activation (EVG 810)=====
 
We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything.
 
   
  +
=====Velion FIB Tool DOWN=====
Runs will still require Staff supervision until then.
 
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
//[[User:Mehalana v|Vraj Mehalana]] 18:01, 2 May 2023 (PDT)
 
  +
=====E-Beam #4 (CHA) - EB4 is down=====
 
 
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
We need to replace a part on the source shutter. We should have it on Monday. I'll update when the tool is available.
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 15:26, 28 April 2023 (PDT)
 
 
=====ICP1 Down=====
=====Wafer Coater (S Cubed Flexi) - S3 field service=====
 
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
S3 will be on-site looking into our hand 2 issues on Wednesday May 3rd and 4th. They will be confirming Monday so there is a chance those days get shifted. Please plan your processing accordingly as the system will not be available while they are here looking into the problem.
 
//[[User:Mehalana v|Vraj Mehalana]] 13:54, 28 April 2023 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
=====FEI SEM#1 Replacement Project=====
 
  +
=====Lab Access Changes: Symmetry App=====
The FEI SEM #1 will be removed and replaced starting Friday March 17th. Both SEMs will be shut down and the SEM room will be off limits beginning at 8 am Friday and return to normal operations Tuesday morning the 21st.
 
  +
The iris scanner has been decommissioned. Please use the card reader which supports:
//[[User:Mehalana v|Vraj Mehalana]] 10:55, 16 March 2023 (PDT)
 
  +
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
-Physical card
<!-- Description of the RSS feed -->
 
  +
  +
-Mobile phone via Symmetry App
  +
 
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
  +
 
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
  +
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 25: Line 29:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
===== Unaxis Etch: Down =====
 
We had to take the VAT controller off of this module to get the ICP-PECVD running. I have no immediate ETA for this system coming back online. Until we get this system running again you will need to use the Oxford Cobra system. -- Tony
 
// [[User:John d|John d]] 09:35, 13 February 2023 (PST)
 
===== Au Plating: UP=====
 
only the full 100mm wafer fixture is available at the moment. You can plate smaller pieces on it with no issues.
 
// [[User:Mehalana v|Vraj Mehalana]] 12:35, 15 March 2023 (PDT)
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />

Latest revision as of 15:07, 27 June 2024

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)