Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(128 intermediate revisions by 4 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
=====Unaxis ICP-PECVD is DOWN=====
 
RF1 continues to be a problem. I will start the process of elimination from a hardware point of view Monday. Once I resolve the hardware issue our Process group will be exclusively running the system for about a week. During this time we will NOT be allowing anyone else to use the system. Sorry for the inconvenience.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 22 September 2023 (PDT)
 
=====Wafer Bonder, (Suss SB6-8E)=====
 
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.
 
   
 
=====Velion FIB Tool DOWN=====
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
 
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
   
 
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
=====Dicing Saw (ADT) Upgrade 10/9=====
 
The dicing saw is scheduled go down for an upgrade on Monday October 9th and will be down for that week and into the weekend. Part of the upgrade will be updated software and will require users to be re-trained. I will provide more info on the re-training once I get a little hands on time with the updated software.
 
I'll send out a couple of reminder emails between now and then and keep everyone updated in the event the schedule for this changes.
 
//[[User:Mehalana v|Vraj Mehalana]] 10:33, 6 September 2023 (PDT)
 
   
=====Stepper #1 (GCA 6300) Scheduled Maintenance=====
+
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
The tool has been scheduled for maintenance on 9-28-23 from 8:00am to 5:00pm. During this time the tool will be unavailable for use. Please plan your lab activities accordingly.
 
//[[User:Mehalana v|Vraj Mehalana]] 10:13, 6 September 2023 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
===== EVG is down=====
+
=====Lab Access Changes: Symmetry App=====
  +
The iris scanner has been decommissioned. Please use the card reader which supports:
I went to check the tool out this morning and found it was not pumping down properly. After further inspection of the tool I found that the lid's quartz liner has cracked. Contacting EVG but the tool will probably be down for some time. I will updated everyone once I have an estimated down time.
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 11:39, 25 September 2023 (PDT)
 
  +
-Physical card
  +
  +
-Mobile phone via Symmetry App
  +
 
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
  +
 
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
 
<!--
 
<!--
Line 27: Line 29:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
 
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />

Revision as of 15:07, 27 June 2024

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)