<startfeed /> |
<startfeed /> |
||
− | =====Unaxis ICP-PECVD is DOWN===== |
||
− | RF1 continues to be a problem. I will start the process of elimination from a hardware point of view Monday. Once I resolve the hardware issue our Process group will be exclusively running the system for about a week. During this time we will NOT be allowing anyone else to use the system. Sorry for the inconvenience. |
||
⚫ | |||
− | ===== |
+ | =====Velion FIB Tool DOWN===== |
+ | Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice. |
||
− | The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update. |
||
⚫ | |||
⚫ | |||
− | =====Dicing Saw (ADT) Upgrade 10/9===== |
||
− | The dicing saw is scheduled go down for an upgrade on Monday October 9th and will be down for that week and into the weekend. Part of the upgrade will be updated software and will require users to be re-trained. I will provide more info on the re-training once I get a little hands on time with the updated software. |
||
− | ADT will be able to transfer your recipes from the GUI software to the NUI software. Please note that we do sometimes run into an issue with a recipe, as it is not a 100% perfect process, but the vast majority of the recipes do transfer over. If there are any you are concerned about, please make sure you have all parameters documented prior to us upgrading the machine. |
||
− | Documentation of recipes is the user's responsibility, Staff will not be taking care of this. |
||
− | -Lee |
||
− | //[[User:Mehalana v|Vraj Mehalana]] 13:25, 3 October 2023 (PDT) |
||
− | =====Stepper #1 (GCA 6300) Scheduled Maintenance===== |
||
− | The scheduled maintenance activates on 9-28-23 have been cancelled and will be rescheduled at a later date. The tool is now available to be reserved for use on that date. |
||
⚫ | |||
⚫ | |||
− | =====Stepper #2 (GCA Autostep 200) - Scheduled Maintenance===== |
||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
− | The Autostep 200 will be undergoing maintenance and will be unavailable on the following dates and times: |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
− | (1) 09-30-23 8:00am-5:00pm |
||
+ | |||
− | (2) 10-01-23 8:00am-5:00pm |
||
+ | =====Lab Access Changes: Symmetry App===== |
||
− | (3) 10-02-23 8:00am-12:00pm |
||
+ | The iris scanner has been decommissioned. Please use the card reader which supports: |
||
− | Please plan your work activities accordingly. |
||
+ | |||
⚫ | |||
+ | -Physical card |
||
+ | |||
+ | -Mobile phone via Symmetry App |
||
+ | |||
⚫ | |||
+ | |||
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
⚫ | |||
⚫ | |||
− | We have received the part to repair the tool but we are still consulting with EVG as to who will be preforming the repair work. We hope to have a better handle on this early next week and will update everyone at that time. -Lee |
||
− | //[[User:Mehalana v|Vraj Mehalana]] 10:51, 29 September 2023 (PDT) |
||
<!-- |
<!-- |
||
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
Line 35: | Line 29: | ||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
− | <!----------------------------------------------> |
||
− | <!------------- Equipment Status ----------------> |
||
− | |||
− | |||
− | <!---------- end of Equipment Status ------------> |
||
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
||
<endfeed /> |
<endfeed /> |
Revision as of 15:07, 27 June 2024
Velion FIB Tool DOWN
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
//Vraj Mehalana 10:58, 30 April 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)