Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
<startfeed />
<startfeed />
=====Unaxis ICP-PECVD Update=====
=====Unaxis ICP-PECVD Update=====
I received word that the matching networks have been repaired and shipped back to us. As soon as I receive them I'll need 1 day to get the system running and released.
It took me a while to weed through the issues as nothing was making sense. What I have found is all of our spare matching networks of this particular type are bad. I will be sending them out for repair and update you all when I have an eta to get the system back online.

//10:48, 25 July 2024 (PDT)


-Tony
//[[User:Mehalana v|Vraj Mehalana]] 12:07, 15 July 2024 (PDT)
=====Dicing Saw Service Visit=====
=====Dicing Saw Service Visit=====
The annual PM on the tool has been completed. However, there is still the issue with the chuck not rotating a perfect 90 degrees after aligning the first angle, so you will still have to perform alignment for angle #2. ADT is looking into sending us a cal plate to try and rectify this as the first potential solution.
The annual PM on the tool has been completed. However, there is still the issue with the chuck not rotating a perfect 90 degrees after aligning the first angle, so you will still have to perform alignment for angle #2. ADT is looking into sending us a cal plate to try and rectify this as the first potential solution.

Revision as of 17:48, 25 July 2024

Unaxis ICP-PECVD Update

I received word that the matching networks have been repaired and shipped back to us. As soon as I receive them I'll need 1 day to get the system running and released.

//10:48, 25 July 2024 (PDT)

Dicing Saw Service Visit

The annual PM on the tool has been completed. However, there is still the issue with the chuck not rotating a perfect 90 degrees after aligning the first angle, so you will still have to perform alignment for angle #2. ADT is looking into sending us a cal plate to try and rectify this as the first potential solution.

-Lee

//Vraj Mehalana 10:23, 8 July 2024 (PDT)

Velion FIB Tool DOWN

Raith service have completed the source change, resolved the power supply and column alignment issues, and restored the Pt deposition capability to full capacity. With remote assistance from Raith I will run some calibrations and stability tests over the next few days. After that I will return the tool to general use towards the end of the week.

The new ion source is AuGeSi. We have no plans to return to GaBiLi for the foreseeable future. Please get in contact if you have any questions.

-Dan

//Vraj Mehalana 10:23, 8 July 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)