Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(44 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
=====DI and Waste Water systems=====
+
=====Unaxis ICP-PECVD Update=====
  +
Unfortunately the shipment of repaired parts was significantly delayed. I will be installing them and testing on Tuesday. With any luck the system will be available Tuesday evening.
DI and Waste Water systems will be down for upgrade April 5th and 6th.
 
  +
//11:53, 18 March 2024 (PDT)
 
  +
Tony
  +
  +
//[[User:Mehalana v|Vraj Mehalana]] 16:26, 26 July 2024 (PDT)
  +
  +
=====Dicing Saw Service Visit=====
  +
The annual PM on the tool has been completed. However, there is still the issue with the chuck not rotating a perfect 90 degrees after aligning the first angle, so you will still have to perform alignment for angle #2. ADT is looking into sending us a cal plate to try and rectify this as the first potential solution.
  +
  +
-Lee
  +
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:23, 8 July 2024 (PDT)
  +
  +
=====Velion FIB Tool DOWN=====
  +
Raith service have completed the source change, resolved the power supply and column alignment issues, and restored the Pt deposition capability to full capacity. With remote assistance from Raith I will run some calibrations and stability tests over the next few days. After that I will return the tool to general use towards the end of the week.
  +
  +
The new ion source is AuGeSi. We have no plans to return to GaBiLi for the foreseeable future. Please get in contact if you have any questions.
  +
  +
-Dan
  +
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:23, 8 July 2024 (PDT)
  +
 
=====ICP1 Down=====
 
=====ICP1 Down=====
 
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
 
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
=====Job Opening: Process Engineer=====
+
=====Lab Access Changes: Symmetry App=====
  +
The iris scanner has been decommissioned. Please use the card reader which supports:
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
 
   
  +
-Physical card
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
 
   
=====Lab Access Changes: Symmetry App=====
+
-Mobile phone via Symmetry App
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
+
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
   
 
=====Wafer Bonder, (Suss SB6-8E)=====
 
=====Wafer Bonder, (Suss SB6-8E)=====
 
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
  +
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   

Revision as of 16:26, 26 July 2024

Unaxis ICP-PECVD Update

Unfortunately the shipment of repaired parts was significantly delayed. I will be installing them and testing on Tuesday. With any luck the system will be available Tuesday evening.

Tony

//Vraj Mehalana 16:26, 26 July 2024 (PDT)

Dicing Saw Service Visit

The annual PM on the tool has been completed. However, there is still the issue with the chuck not rotating a perfect 90 degrees after aligning the first angle, so you will still have to perform alignment for angle #2. ADT is looking into sending us a cal plate to try and rectify this as the first potential solution.

-Lee

//Vraj Mehalana 10:23, 8 July 2024 (PDT)

Velion FIB Tool DOWN

Raith service have completed the source change, resolved the power supply and column alignment issues, and restored the Pt deposition capability to full capacity. With remote assistance from Raith I will run some calibrations and stability tests over the next few days. After that I will return the tool to general use towards the end of the week.

The new ion source is AuGeSi. We have no plans to return to GaBiLi for the foreseeable future. Please get in contact if you have any questions.

-Dan

//Vraj Mehalana 10:23, 8 July 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.

//Vraj Mehalana 14:23, 13 December 2023 (PST)