Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(25 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
 
=====Unaxis ICP-PECVD Update=====
=====Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair=====
 
  +
Unfortunately the shipment of repaired parts was significantly delayed. I will be installing them and testing on Tuesday. With any luck the system will be available Tuesday evening.
I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis
 
   
  +
Tony
//[[User:Mehalana v|Vraj Mehalana]] 13:42, 9 May 2024 (PDT)
 
=====MA6 TSA is down - Update=====
 
The new board did not resolve the issue with the TSA. Our vendor had me try a few things to no avail. Waiting to see how we are proceeding.
 
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 16:26, 26 July 2024 (PDT)
Tool is still up for backside alignment.
 
   
  +
=====Dicing Saw Service Visit=====
  +
The annual PM on the tool has been completed. However, there is still the issue with the chuck not rotating a perfect 90 degrees after aligning the first angle, so you will still have to perform alignment for angle #2. ADT is looking into sending us a cal plate to try and rectify this as the first potential solution.
   
  +
-Lee
//[[User:Mehalana v|Vraj Mehalana]] 12:10, 13 May 2024 (PDT)
 
  +
 
//[[User:Mehalana v|Vraj Mehalana]] 10:23, 8 July 2024 (PDT)
   
 
=====Velion FIB Tool DOWN=====
 
=====Velion FIB Tool DOWN=====
  +
Raith service have completed the source change, resolved the power supply and column alignment issues, and restored the Pt deposition capability to full capacity. With remote assistance from Raith I will run some calibrations and stability tests over the next few days. After that I will return the tool to general use towards the end of the week.
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
 
   
  +
The new ion source is AuGeSi. We have no plans to return to GaBiLi for the foreseeable future. Please get in contact if you have any questions.
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
 
   
  +
-Dan
=====ASML optics replacement May 20th-22nd=====
 
We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.
 
   
//[[User:Mehalana v|Vraj Mehalana]] 09:40, 9 May 2024 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 10:23, 8 July 2024 (PDT)
   
 
=====ICP1 Down=====
 
=====ICP1 Down=====
Line 27: Line 28:
   
 
=====Lab Access Changes: Symmetry App=====
 
=====Lab Access Changes: Symmetry App=====
  +
The iris scanner has been decommissioned. Please use the card reader which supports:
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
  +
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
 
  +
-Physical card
  +
  +
-Mobile phone via Symmetry App
  +
 
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
   
 
=====Wafer Bonder, (Suss SB6-8E)=====
 
=====Wafer Bonder, (Suss SB6-8E)=====
 
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
  +
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   

Revision as of 16:26, 26 July 2024

Unaxis ICP-PECVD Update

Unfortunately the shipment of repaired parts was significantly delayed. I will be installing them and testing on Tuesday. With any luck the system will be available Tuesday evening.

Tony

//Vraj Mehalana 16:26, 26 July 2024 (PDT)

Dicing Saw Service Visit

The annual PM on the tool has been completed. However, there is still the issue with the chuck not rotating a perfect 90 degrees after aligning the first angle, so you will still have to perform alignment for angle #2. ADT is looking into sending us a cal plate to try and rectify this as the first potential solution.

-Lee

//Vraj Mehalana 10:23, 8 July 2024 (PDT)

Velion FIB Tool DOWN

Raith service have completed the source change, resolved the power supply and column alignment issues, and restored the Pt deposition capability to full capacity. With remote assistance from Raith I will run some calibrations and stability tests over the next few days. After that I will return the tool to general use towards the end of the week.

The new ion source is AuGeSi. We have no plans to return to GaBiLi for the foreseeable future. Please get in contact if you have any questions.

-Dan

//Vraj Mehalana 10:23, 8 July 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.

//Vraj Mehalana 14:23, 13 December 2023 (PST)