Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
 
(200 intermediate revisions by 6 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
=====SEM 1 Update=====
 
The field service engineer is finishing up mechanical alignments today and will move on to electronic alignments and current testing tomorrow. If everything continues to go well the tool should be available for use Thursday or Friday.
 
We'll send out an email once the tool is back up.
 
//[[User:Mehalana v|Vraj Mehalana]] 11:50, 14 July 2023 (PDT)
 
=====SEM 2 Update=====
 
Once SEM 1 is up we’ll wait for at least a week before we decommission SEM 2.
 
//[[User:Mehalana v|Vraj Mehalana]] 11:16, 12 July 2023 (PDT)
 
   
=====Plasma Activation (EVG 810)=====
+
=====Stepper #3 (ASML DUV) - Tool down=====
  +
Wafer stage positioning laser is dying, Asml engineers will be on site Monday and Tuesday to repair. We have the replacement already on hand.
We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything.
 
  +
Runs will still require Staff supervision until then.
 
//[[User:Mehalana v|Vraj Mehalana]] 18:01, 2 May 2023 (PDT)
+
Unfortunately, we cannot initialize the stage at this time. System is down. // [[User:Mehalana v|Vraj Mehalana]] 18:36, 3 October 2024 (PDT)
  +
  +
=====MLA Service Complete=====
  +
The FSE has completed their work.
  +
  +
I ran beam offset checks on both lasers prior to the maintenance and found that the Y axis value for the 405 laser was off by ~0.6 µm. I made the necessary change and ran another check with all values in spec. I also ran beam offset checks on both laser post maintenance along with an overlay exposure and all looked good.
  +
  +
Tool is available to use.
  +
  +
-Lee // [[User:John_d|Demis D. John]] 17:46, 2 October 2024 (PDT)
  +
 
=====Suss SB6-8E=====
  +
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
  +
  +
-Aidan
 
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)
  +
 
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
The iris scanner has been decommissioned. Please use the card reader which supports:
  +
  +
-Physical card
  +
  +
-Mobile phone via Symmetry App
  +
 
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
   
 
<!--
 
<!--
Line 19: Line 40:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
 
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />

Latest revision as of 18:36, 3 October 2024

Stepper #3 (ASML DUV) - Tool down

Wafer stage positioning laser is dying, Asml engineers will be on site Monday and Tuesday to repair. We have the replacement already on hand.

Unfortunately, we cannot initialize the stage at this time. System is down. // Vraj Mehalana 18:36, 3 October 2024 (PDT)

MLA Service Complete

The FSE has completed their work.

I ran beam offset checks on both lasers prior to the maintenance and found that the Y axis value for the 405 laser was off by ~0.6 µm. I made the necessary change and ran another check with all values in spec. I also ran beam offset checks on both laser post maintenance along with an overlay exposure and all looked good.

Tool is available to use.

-Lee // Demis D. John 17:46, 2 October 2024 (PDT)

Suss SB6-8E

When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.

-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)