Template:Announcements: Difference between revisions
Mehalana v (talk | contribs) No edit summary |
Mehalana v (talk | contribs) No edit summary |
||
(157 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
===== |
=====Stepper #3 (ASML DUV) - Tool down===== |
||
Wafer stage positioning laser is dying, Asml engineers will be on site Monday and Tuesday to repair. We have the replacement already on hand. |
|||
Test run completed without issue. System is ready to use, EXCEPT for heater - contact supervisor for heater use. See email for updates to operating procedure. |
|||
//[[User:Mehalana v|Vraj Mehalana]] |
Unfortunately, we cannot initialize the stage at this time. System is down. // [[User:Mehalana v|Vraj Mehalana]] 18:36, 3 October 2024 (PDT) |
||
=====ProbeStation scheduled IT maintenance===== |
|||
The ProbeStation will be undergoing IT maintenance and will be unavailable on the following dates : |
|||
* 10-30-23 |
|||
* 10-31-23 |
|||
Please plan your work activities accordingly. |
|||
=====MLA Service Complete===== |
|||
⚫ | |||
The FSE has completed their work. |
|||
I ran beam offset checks on both lasers prior to the maintenance and found that the Y axis value for the 405 laser was off by ~0.6 µm. I made the necessary change and ran another check with all values in spec. I also ran beam offset checks on both laser post maintenance along with an overlay exposure and all looked good. |
|||
⚫ | |||
Initially it was planned to remove the hoist again to rebuild it to solve the leak. |
|||
⚫ | |||
The manufacturer is sending out a rebuild kit under warranty since it is a brand new hoist that is leaking. |
|||
When that arrives I will schedule another all day event to rebuild the hoist. |
|||
-Lee // [[User:John_d|Demis D. John]] 17:46, 2 October 2024 (PDT) |
|||
I cleaned up the leaked oil, checked oil level, and did an inspection of the tool. |
|||
⚫ | |||
⚫ | |||
⚫ | |||
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed. |
|||
=====Unaxis ICP-PECVD is UP for Non-GapFill===== |
|||
Tool is up for NON-GapFill (450W RF Bias) Recipes. Other Std SiO2/SiN deps are available. |
|||
Next Week Monday Oct 16th to Wed 18th we will allow GapFill (450W RF Bias) recipes to be run. |
|||
Please plan your process accordingly. |
|||
Also we are still testing our own GapFill recipe that hopefully reduces flakes. Once this is ready you’ll want to qualify our new recipe to make sure it works for your application, as the old GapFill recipe will eventually be deprecated & disallowed. |
|||
-Aidan |
|||
⚫ | |||
⚫ | |||
===== |
=====ICP1 Down===== |
||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update. |
|||
⚫ | |||
=====Lab Access Changes: Symmetry App===== |
|||
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT) |
|||
The iris scanner has been decommissioned. Please use the card reader which supports: |
|||
-Physical card |
|||
=====EVG Activation: Up===== |
|||
The FSE has completed the work on the tool and I have made several test runs without issue. |
|||
-Mobile phone via Symmetry App |
|||
IMPORTANT - Please see corresponding email for changes in operation. |
|||
⚫ | |||
⚫ | |||
<!-- |
<!-- |
||
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
Line 48: | Line 40: | ||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
<!----------------------------------------------> |
|||
<!------------- Equipment Status ----------------> |
|||
<!---------- end of Equipment Status ------------> |
|||
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
||
<endfeed /> |
<endfeed /> |
Revision as of 01:36, 4 October 2024
Stepper #3 (ASML DUV) - Tool down
Wafer stage positioning laser is dying, Asml engineers will be on site Monday and Tuesday to repair. We have the replacement already on hand.
Unfortunately, we cannot initialize the stage at this time. System is down. // Vraj Mehalana 18:36, 3 October 2024 (PDT)
MLA Service Complete
The FSE has completed their work.
I ran beam offset checks on both lasers prior to the maintenance and found that the Y axis value for the 405 laser was off by ~0.6 µm. I made the necessary change and ran another check with all values in spec. I also ran beam offset checks on both laser post maintenance along with an overlay exposure and all looked good.
Tool is available to use.
-Lee // Demis D. John 17:46, 2 October 2024 (PDT)
Suss SB6-8E
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)