=====DUV is down - Update=====
contacted our vendor for an update and was told that the parts should ship by this Friday. If all goes well the tool should be up mid next week.


=====Stepper #3 (ASML DUV) - Tool down=====
//[[User:Mehalana v|Vraj Mehalana]] 14:07, 13 December 2023 (PST)
Wafer stage positioning laser is dying, Asml engineers will be on site Monday and Tuesday to repair. We have the replacement already on hand.


Unfortunately, we cannot initialize the stage at this time. System is down. // [[User:Mehalana v|Vraj Mehalana]] 18:36, 3 October 2024 (PDT)
=====PECVD2 Planned Down Time for Maintenance 12-11-23=====
PECVD2 will be going down on Monday 12-11-23 at 10:00am for replacement of the RF connector and RF Electrode.


=====MLA Service Complete=====
When the work is complete, the process group will be running tests for the remainder of the afternoon.
The FSE has completed their work.


I ran beam offset checks on both lasers prior to the maintenance and found that the Y axis value for the 405 laser was off by ~0.6 µm. I made the necessary change and ran another check with all values in spec. I also ran beam offset checks on both laser post maintenance along with an overlay exposure and all looked good.
//[[User:Mehalana v|Vraj Mehalana]] 14:07, 13 December 2023 (PST)
=====Year End Shutdown=====
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm.
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd.


Tool is available to use.
//[[User:Mehalana v|Vraj Mehalana]] 14:39, 16 November 2023 (PST)


-Lee // [[User:John_d|Demis D. John]] 17:46, 2 October 2024 (PDT)
=====PECVD2 is up for SiO2 and Std SiN Only=====
We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first.
Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20


=====Suss SB6-8E=====
// [[User:Thibeault|Thibeault]] 09:10, 16 November 2023 (PST)
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.


-Aidan
=====Job Opening: Process Engineer=====
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.


=====ICP1 Down=====
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT)
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)


=====Lab Access Changes: Symmetry App=====
=====Lab Access Changes: Symmetry App=====
The iris scanner has been decommissioned. Please use the card reader which supports:
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.


-Physical card
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)

-Mobile phone via Symmetry App

//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)


=====Wafer Bonder, (Suss SB6-8E)=====
SUSS now aims to be on site in early February. I’ll will send out an email once I get confirmation for a specific date.
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
<!--
<!--
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.

Revision as of 01:36, 4 October 2024

Stepper #3 (ASML DUV) - Tool down

Wafer stage positioning laser is dying, Asml engineers will be on site Monday and Tuesday to repair. We have the replacement already on hand.

Unfortunately, we cannot initialize the stage at this time. System is down. // Vraj Mehalana 18:36, 3 October 2024 (PDT)

MLA Service Complete

The FSE has completed their work.

I ran beam offset checks on both lasers prior to the maintenance and found that the Y axis value for the 405 laser was off by ~0.6 µm. I made the necessary change and ran another check with all values in spec. I also ran beam offset checks on both laser post maintenance along with an overlay exposure and all looked good.

Tool is available to use.

-Lee // Demis D. John 17:46, 2 October 2024 (PDT)

Suss SB6-8E

When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.

-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)