Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(mla down)
(deleted ASML update)
 
(39 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />
=====LAB CLOSED 8a-9am, Friday Sept 5th, 2024=====
We need to change the oil in our house vacuum system tomorrow morning from 8 a.m. until 9 a.m. please schedule your process accordingly. I apologize for the short notice.

Thanks,

Michael Silva
// [[User:John_d|Demis D. John]] 09:27, 5 September 2024 (PDT)

=====MLA150: Down=====
The tool is currently unavailable while we address the current issue we are experiencing with the head. Sorry for any inconvenience this may have caused.

Thanks
Bill Millerski

// [[User:John_d|Demis D. John]] 11:51, 5 September 2024 (PDT)


=====Suss SB6-8E=====
=====Suss SB6-8E=====
Line 21: Line 6:
-Aidan
-Aidan
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)


=====EBeam#2: Down=====
Good news is we have repaired and reinstalled the hoist, thanks Mike B. and Bill. I have tested it and everything looks good.

However, the repaired bell jar mount is not sliding down the hoist pole like it should. Since the repair involved some welding to the collar that slides down the hoist pole, we surmise that the concentricity was affected by the heat. The mount is back at the machine shop getting honed out. I should have it back to test late today/early tomorrow but it may have to go back again. Once it is able to slide on properly the tool should be up shortly thereafter.

-Lee // [[User:John_d|Demis D. John]] 14:24, 27 August 2024 (PDT)

=====YES EcoClean: 3kW only=====
I swapped out the RF generator and the tool is working again. I am getting repeated CCP warnings for the 0.7kW recipes so we will need to look into that further.

System is up for 3kW recipes only.

DO NOT run 0.7kW recipes until further notice!!

--
Lee Sawyer//[[User:John_d|Demis D. John]] 11:31, 23 August 2024 (PDT)


=====ICP1 Down=====
=====ICP1 Down=====

Latest revision as of 00:45, 7 November 2024

Suss SB6-8E

When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.

-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)