Template:Announcements: Difference between revisions
m (→IBD is UP) |
|||
(27 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
=====IBD is UP===== |
|||
Replaced bad PLC controller on Depo beam. I then tested the beam with a 15 min gridclean recipe without issue. |
|||
I then ran an SiO2 dep, and a 1 hour gridclean without issue. |
|||
=====Lab Shutdown: Dec 26 to Jan 3rd===== |
|||
System UP - Mike Barreraz |
|||
⚫ | |||
We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed. |
|||
=====Focused Ion Beam (Raith Velion) - TOOL DOWN for Raith Service===== |
|||
Some users have experienced issues with column alignment when using Au ions. Raith service will be onsite today and tomrrow to make adjustments. I'll run checks and calibrations over the weekend. I expect the Raith Velion to be available again on Monday morning (Sept 16th). I'll send further updates if anything changes. |
|||
During the shutdown this year we will be pulling all cleanroom suits and stocking new suits. |
|||
-Dan |
|||
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 12 September 2024 (PDT) |
|||
PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH |
|||
=====Lab Closure Monday the 16th===== |
|||
We will be closing the Nanofab Monday, September 16, 2024 from 7 a.m. until 8:30 a.m. to accommodate the testing of the fire alarm system. Please schedule your process accordingly. |
|||
// [[User:Mehalana v|Vraj Mehalana]] 10:57, 12 September 2024 (PDT) |
|||
//[[User:John_d|Demis D. John]] 16:55, 24 November 2024 (UTC) |
|||
=====MLA150: UP===== |
|||
Optical AF has been calibrated and Defocus + Dose values are the same as before. PneuAF has not been checked et, but we expect a shift in PneuAF Defocus due to the Pneumatic nozzle replacement. |
|||
⚫ | |||
===== |
=====New Gowns in Jan===== |
||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. |
|||
The alignment laser has now fully failed (no laser output at all), so we can't perform any exposures. |
|||
⚫ | |||
ASML engineers will be on site Monday Tues (Sept 16th) to perform the repair. |
|||
// [[User:John_d|Demis D. John]] 18:14, 11 September 2024 (PDT) |
|||
=====Suss SB6-8E===== |
=====Suss SB6-8E===== |
||
Line 31: | Line 20: | ||
-Aidan |
-Aidan |
||
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT) |
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT) |
||
=====EBeam#2: Up===== |
|||
Bell jar mount is in place. Hoist has been tested several times. System is ready to use. |
|||
// [[User:John_d|Demis D. John]] 18:14, 11 September 2024 (PDT) |
|||
=====YES EcoClean UP===== |
|||
The YES has been giving downstream temp warnings for the RF generator. These happen on the 3000W recipes that run for more than 4-5 minutes, and are just warnings (yellow banner/light), and can just be acknowledged without notifying Staff. Our other generator is out for repair, so this will be the norm until we get it back. Please let us know if you do get an error for this; red banner/light. |
|||
// [[User:John_d|Demis D. John]] 18:14, 11 September 2024 (PDT) |
|||
=====ICP1 Down===== |
=====ICP1 Down===== |
Latest revision as of 16:58, 24 November 2024
Lab Shutdown: Dec 26 to Jan 3rd
We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.
During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.
PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH
//Demis D. John 16:55, 24 November 2024 (UTC)
New Gowns in Jan
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. // Demis D. John 16:58, 24 November 2024 (UTC)
Suss SB6-8E
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)