Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
No edit summary
 
(17 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />
=====DSE is UP=====
I’ve completed the installation of the new spool and lamps and the tool is free to use. We’ve run a number of different etches and upon initial inspection everything looks normal. However, it’s recommended you start with a test etch in case there is a slight shift in process.


=====Lab Shutdown: Dec 26 to Jan 3rd=====
Thanks, Aidan
// [[User:John_d|Demis D. John]] 12:36, 20 September 2024 (PDT)


We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.
=====Focused Ion Beam (Raith Velion) - TOOL DOWN for Raith Service=====
Raith service need to work on the Velion a little longer than anticipated. I'll keep the tool down until 2pm tomorrow (Tuesday). I'll send further updates if anything changes.


During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.
-Dan
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 12 September 2024 (PDT)


PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH
=====MLA150: UP=====

Optical AF has been calibrated and Defocus + Dose values are the same as before. PneuAF has not been checked et, but we expect a shift in PneuAF Defocus due to the Pneumatic nozzle replacement.
// [[User:John_d|Demis D. John]] 18:14, 11 September 2024 (PDT)
//[[User:John_d|Demis D. John]] 16:55, 24 November 2024 (UTC)

=====New Gowns in Jan=====
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use.
// [[User:John_d|Demis D. John]] 16:58, 24 November 2024 (UTC)


=====Suss SB6-8E=====
=====Suss SB6-8E=====
Line 21: Line 20:
-Aidan
-Aidan
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)

=====YES is available=====
The error has been cleared and I ran a shorter 5 minute recipe with no warning/error.

This seems to be exclusive to the longer (8+ minute recipes), which are throwing warnings for every wafer run this long. It also appears that running 3 wafers on a longer recipe will result in an error and aborted run on the 3rd wafer. We are just going to have to live with this until we have our other generator back. So until then, please limit the longer runs to 2 wafers max. If you have more than 2 wafers to run on a longer recipe then wait about 5-10 minutes in between batches.

// [[User:Mehalana v|Vraj Mehalana]] 14:16, 18 September 2024 (PDT)


=====ICP1 Down=====
=====ICP1 Down=====

Latest revision as of 16:58, 24 November 2024

Lab Shutdown: Dec 26 to Jan 3rd

We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.

During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.

PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH

//Demis D. John 16:55, 24 November 2024 (UTC)

New Gowns in Jan

We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. // Demis D. John 16:58, 24 November 2024 (UTC)

Suss SB6-8E

When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.

-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)