The cleanroom is back up and running and you are welcomed back into the lab. Please check your emails for individual equipment status. Sorry for the inconvenience. |
|||
//11:32, 14 June 2023 (PDT) |
|||
===== |
=====Lab is Open===== |
||
We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything. |
|||
All suits have been pulled and clean sheets have been put up. All personal items left behind can be found in the boxes in the lobby. |
|||
Runs will still require Staff supervision until then. |
|||
⚫ | |||
Please sign up for your hanger spot. |
|||
THE LAB IS NOW OPEN FOR BUSINESS |
|||
Thank you for your patience during shutdown activities. |
|||
-- [[Peder Lenvik]] |
|||
// [[User:John_d|Demis D. John]] 03:34, 3 January 2025 (UTC) |
|||
⚫ | |||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. |
|||
// [[User:John_d|Demis D. John]] 03:34, 3 January 2025 (UTC) |
|||
=====KLA P7 Profilometer: Down===== |
|||
The KLA remains down awaiting parts. This part order has been expedited to the extent possible and should be here in the next few days. |
|||
Thanks |
|||
Bill Millerski |
|||
// [[User:John_d|Demis D. John]] 03:30, 3 January 2025 (UTC) |
|||
=====Oxford ALD+Ion Mill===== |
|||
Unfortunately, we are still experiencing issues with the tool and it remains unavailable. This tool issue remains my highest priority, and we are working closely with the vendor to try and resolve this issue as soon as possible. -- Bill Millerski |
|||
// [[User:John_d|Demis D. John]] 03:29, 3 January 2025 (UTC) |
|||
=====Holography/PL: HeCd Laser Down Mon Dec 16th===== |
|||
The 325nm UV Laser will be unavailable from Mon. Dec 16th, through the christmas shutdown, and will be available again soon after Monday Jan 6th. |
|||
We will be installing the refurbished laser which will have higher output power. |
|||
Holography will be unavailable during this time, but all other PL lasers will be available. |
|||
// [[User:John_d|Demis D. John]] 03:28, 3 January 2025 (UTC) |
|||
=====Suss SB6-8E===== |
|||
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests. |
|||
I will send out an update once we have one. |
|||
-Aidan |
|||
// [[User:John_d|Demis D. John]] 00:35, 8 December 2024 (UTC) |
|||
=====ICP1 Down===== |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
⚫ | |||
<!-- |
<!-- |
||
Line 15: | Line 53: | ||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
<!----------------------------------------------> |
|||
<!------------- Equipment Status ----------------> |
|||
<!---------- end of Equipment Status ------------> |
|||
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
||
<endfeed /> |
<endfeed /> |
Latest revision as of 03:39, 3 January 2025
Lab is Open
All suits have been pulled and clean sheets have been put up. All personal items left behind can be found in the boxes in the lobby.
Please sign up for your hanger spot.
THE LAB IS NOW OPEN FOR BUSINESS
Thank you for your patience during shutdown activities. -- Peder Lenvik
// Demis D. John 03:34, 3 January 2025 (UTC)
New Gowns in Jan
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. // Demis D. John 03:34, 3 January 2025 (UTC)
KLA P7 Profilometer: Down
The KLA remains down awaiting parts. This part order has been expedited to the extent possible and should be here in the next few days.
Thanks Bill Millerski // Demis D. John 03:30, 3 January 2025 (UTC)
Oxford ALD+Ion Mill
Unfortunately, we are still experiencing issues with the tool and it remains unavailable. This tool issue remains my highest priority, and we are working closely with the vendor to try and resolve this issue as soon as possible. -- Bill Millerski // Demis D. John 03:29, 3 January 2025 (UTC)
Holography/PL: HeCd Laser Down Mon Dec 16th
The 325nm UV Laser will be unavailable from Mon. Dec 16th, through the christmas shutdown, and will be available again soon after Monday Jan 6th. We will be installing the refurbished laser which will have higher output power.
Holography will be unavailable during this time, but all other PL lasers will be available. // Demis D. John 03:28, 3 January 2025 (UTC)
Suss SB6-8E
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.
I will send out an update once we have one. -Aidan // Demis D. John 00:35, 8 December 2024 (UTC)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)