Template:Announcements: Difference between revisions
m (bold) |
(EBL move update) |
||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
=====EBL Move-In: Tues 9-11a===== |
|||
<feedBurner name="UCSBNanofab-Announcements" /> |
|||
Users, |
|||
⚫ | |||
'''How to add new news items''' |
|||
Thank you for your patience while we moved the new EBL system in. |
|||
* Delete the old announcement, and replace with your new announcement |
|||
* NO user signature is required for this template since only one or two items will ever be shown. |
|||
* If you do need items to be shown in chronological order, then you must add a user signature at the end of each post via four tildes: ~~~~, then delete the name after the two dashes "--" and delete the "[[(talk)...]]" link |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
The '''NanoFab is CLOSED''' until further notice due to intermittent power outages. |
|||
The lab is fully open for use. |
|||
The [http://www.latimes.com/local/california/la-me-southern-california-wildfires-live-follow-live-fire-coverage-from-l-a-1512492176-htmlstory.html Thomas Fire & Rye Fire] have been causing repeated power outages since the evening of Monday 12/4. CalFire has updates on [http://www.fire.ca.gov/current_incidents/incidentdetails/Index/1922 their webpage] and [https://www.facebook.com/CALFIRE FaceBook page]. |
|||
Peder Lenvik |
|||
[[User:John d|John d]] ([[User talk:John d|talk]]) 10:37, 5 December 2017 (PST) |
|||
⚫ | |||
Sr. Facilities Lead |
|||
<!----------------------------------------------> |
|||
// [[User:John_d|Demis D. John]] 23:47, 10 March 2025 (UTC) |
|||
=====MLA150 is UP===== |
|||
System will be available at 12:30 today (Fri Mar 7th). No changes to OAF settings but PAF has moved about 10 points positive for focus. We will work on adjusting PAF back to around 0 (on our cal resist) some time next week. |
|||
-Lee |
|||
//[[User:John_d|Demis D. John]] 20:51, 7 March 2025 (UTC) |
|||
=====Stepper #3 (ASML DUV) - Maint Complete ===== |
|||
ASML Maintenance is complete, the system is up. |
|||
// [[User:John_d|Demis D. John]] 02:18, 7 March 2025 (UTC) |
|||
=====RIE #5 Down: Mon March 13th ===== |
|||
RIE #5 will be down Monday March 13th through the end of Wednesday March 15th for maintenance. |
|||
If we complete the job early we will send a follow-up email releasing the system. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 09:46, 21 February 2025 (UTC) |
|||
=====New Gowns: Toolbelts purchases===== |
|||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase. |
|||
Two vendors for cleanroom belts we are using are listed here, you may request others: |
|||
* [https://www.terrauniversal.com/tool-belt-pocket-49in-waist-white-altessa-grid-uniform-technology-4954-60a.html Uniform Technology Tool Belt] - note the waist size, the 49” belt fits up to ~36-38” waist. |
|||
* [https://www.fishersci.com/shop/products/cleanroom-fannypack-1-ea-white/NC0723118?searchHijack=true&searchTerm=cleanroom-fannypack-1-ea-white&searchType=Rapid&matchedCatNo=NC0723118 HiTEC Fannypack] |
|||
// [[User:John_d|Demis D. John]] 03:34, 3 January 2025 (UTC) |
|||
=====Suss SB6-8E===== |
|||
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests. |
|||
I will send out an update once we have one. |
|||
-Aidan |
|||
// [[User:John_d|Demis D. John]] 00:35, 8 December 2024 (UTC) |
|||
=====ICP1 Down===== |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
|||
⚫ | |||
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
|||
In order for your post to show up correctly, you need to: |
|||
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
|||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
|||
⚫ | |||
⚫ | |||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
⚫ | |||
⚫ | |||
* You can copy/paste the example below for a new news item. |
|||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
|||
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
|||
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
|||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
|||
⚫ | |||
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
|||
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
|||
******** EXAMPLE OF A NEW POST ******** |
|||
===== NanoFab making LN2 icecream ===== |
|||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
|||
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) |
|||
************* (end of example) ************** |
|||
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
|||
⚫ |
Latest revision as of 19:15, 11 March 2025
EBL Move-In: Tues 9-11a
Users,
Thank you for your patience while we moved the new EBL system in.
The lab is fully open for use.
Peder Lenvik
Sr. Facilities Lead // Demis D. John 23:47, 10 March 2025 (UTC)
MLA150 is UP
System will be available at 12:30 today (Fri Mar 7th). No changes to OAF settings but PAF has moved about 10 points positive for focus. We will work on adjusting PAF back to around 0 (on our cal resist) some time next week. -Lee //Demis D. John 20:51, 7 March 2025 (UTC)
Stepper #3 (ASML DUV) - Maint Complete
ASML Maintenance is complete, the system is up. // Demis D. John 02:18, 7 March 2025 (UTC)
RIE #5 Down: Mon March 13th
RIE #5 will be down Monday March 13th through the end of Wednesday March 15th for maintenance.
If we complete the job early we will send a follow-up email releasing the system.
//Vraj Mehalana 09:46, 21 February 2025 (UTC)
New Gowns: Toolbelts purchases
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase.
Two vendors for cleanroom belts we are using are listed here, you may request others:
- Uniform Technology Tool Belt - note the waist size, the 49” belt fits up to ~36-38” waist.
- HiTEC Fannypack
// Demis D. John 03:34, 3 January 2025 (UTC)
Suss SB6-8E
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.
I will send out an update once we have one. -Aidan // Demis D. John 00:35, 8 December 2024 (UTC)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)