Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(holiday closures)
 
(892 intermediate revisions by 8 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
  +
=====EBeam4 Update - Still down=====
<feedBurner name="UCSBNanofab-Announcements" />
 
  +
EBeam4 will remain down overnight.
<!--
 
'''How to add new news items'''
 
   
  +
The new motor arrived as well as the new junction box and new cables.
* Use level 5 heading for each item - they will show up as separate RSS items this way.
 
* You must add a user signature at the end of each post via four tildes: ~~~~, then after saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. Most recent date shows up at the top.
 
* "There are no announcements at this time." should be used to indicate when empty.
 
* Use double-slash at start of new lines - makes display on the Samsung Display look a lot better.
 
-->
 
<!---------------------------------------------->
 
<!------------- Announcements ---------------->
 
===== Announcements =====
 
// The NanoFab is Open.
 
   
  +
I removed the old junction box/plugs due to a lot of corrosion inside the box caused by it being located directly under the water supply lines.
// The [http://countyofsb.org/thomasfire.sbc Thomas Fire] has caused repeated power outages since the evening of Monday 12/4. CalFire is posting updates on [http://www.fire.ca.gov/current_incidents/incidentdetails/Index/1922 their webpage] and [https://www.facebook.com/CALFIRE FaceBook page].
 
   
  +
This corrosion inside the box could have contributed to the failure of the old motor.
// [[User:John d|Posted:]] 13:07, 11 December 2017 (PST)
 
   
  +
I installed the new motor, ran all new cables to the new junction box in it's new location away from the water lines.
   
  +
I was able to test the function of the hoist by raising and lowering the bell jar while in manual mode.
===== Holiday Closures =====
 
// The Nanofab will be closed on Thursday, 12/28 and Friday 12/29 for lab maintenance. No one will be allowed into the lab during these days.
 
   
  +
For safety reasons, I had the machine powered off during the duration of the work being done, so the cryo will be in regen overnight.
// The official staff holiday schedule is on Monday, 12/25 and Tuesday, 12/26. The lab will still be open for use during these off days, but staff will not be here to help.
 
   
  +
Tomorrow morning I will continue testing the system to ensure everything is working properly before I release the tool.
// [[User:John d|John d]] ([[User talk:John d|talk]]) 09:32, 14 December 2017 (PST)
 
   
  +
I will send another email when an update is available.
===== Cary 500 =====
 
UV-Vis Detector Failure. Locating replacement.
 
// [[User:John d|Posted:]] 15:06, 7 December 2017 (PST)
 
   
  +
//10:36, 30 May 2024 (PDT)
   
===== GCA 6300 Stepper #1 =====
+
=====Stepper #3 (ASML DUV) - System UP and calibrated=====
  +
We have finished calibrations,
Lamp power supply has been replaced.
 
  +
System is up.
// [[User:John d|Posted:]] 16:31, 11 December 2017 (PST)
 
   
  +
Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose.
<!---------- end of announcements ------------>
 
  +
<!---------------------------------------------->
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT)
  +
  +
=====Atomic Force Microscope (Dimension ICON) - 05/17: System UP=====
  +
Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!
  +
  +
//[[User:Mehalana v|Vraj Mehalana]] 13:46, 20 May 2024 (PDT)
  +
  +
=====MA6 TSA is down - Update=====
  +
We have received the replacement motor for the TSA Y axis. The FSE will be onsite Monday June 3rd to work on the tool.
  +
  +
The tool remains up for backside alignment and topside exposures that do not require alignment.
  +
  +
-Lee
  +
//15:59, 22 May 2024 (PDT)
  +
  +
=====Velion FIB Tool DOWN=====
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
  +
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
  +
  +
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
The iris scanner has been decommissioned. Please use the card reader which supports:
  +
  +
-Physical card
  +
  +
-Mobile phone via Symmetry App
  +
  +
//10:54, 23 May 2024 (PDT)
  +
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
  +
  +
<!--
  +
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
  +
In order for your post to show up correctly, you need to:
  +
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
  +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
  +
-->
  +
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<noinclude>[[Category:Templates]]</noinclude>
  +
<!--------------------------------------------
  +
====== HOW TO ADD ITEMS ======
  +
* You can copy/paste the example below for a new news item.
  +
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
  +
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
  +
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
  +
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
  +
* Please use "There are no announcements at this time." if the announcements are empty.
  +
  +
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  +
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  +
  +
  +
******** EXAMPLE OF A NEW POST ********
  +
  +
===== NanoFab making LN2 icecream =====
  +
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
  +
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
  +
  +
************* (end of example) **************
  +
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
  +
---------------------------------------------->

Latest revision as of 10:36, 30 May 2024

EBeam4 Update - Still down

EBeam4 will remain down overnight.

The new motor arrived as well as the new junction box and new cables.

I removed the old junction box/plugs due to a lot of corrosion inside the box caused by it being located directly under the water supply lines.

This corrosion inside the box could have contributed to the failure of the old motor.

I installed the new motor, ran all new cables to the new junction box in it's new location away from the water lines.

I was able to test the function of the hoist by raising and lowering the bell jar while in manual mode.

For safety reasons, I had the machine powered off during the duration of the work being done, so the cryo will be in regen overnight.

Tomorrow morning I will continue testing the system to ensure everything is working properly before I release the tool.

I will send another email when an update is available.

//10:36, 30 May 2024 (PDT)

Stepper #3 (ASML DUV) - System UP and calibrated

We have finished calibrations, System is up.

Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose.

//Vraj Mehalana 11:17, 24 May 2024 (PDT)

Atomic Force Microscope (Dimension ICON) - 05/17: System UP

Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!

//Vraj Mehalana 13:46, 20 May 2024 (PDT)

MA6 TSA is down - Update

We have received the replacement motor for the TSA Y axis. The FSE will be onsite Monday June 3rd to work on the tool.

The tool remains up for backside alignment and topside exposures that do not require alignment.

-Lee //15:59, 22 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//10:54, 23 May 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)