Template:Announcements: Difference between revisions
m (sig) |
(EBL move update) |
||
(991 intermediate revisions by 8 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
=====EBL Move-In: Tues 9-11a===== |
|||
<!--feedBurner name="UCSBNanofab-Announcements" /--> |
|||
Users, |
|||
<!-- Description of the RSS feed --> |
|||
''UCSB NanoFab Announcements'' |
|||
⚫ | |||
'''How to add new news items''' |
|||
Thank you for your patience while we moved the new EBL system in. |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
===== Announcements ===== |
|||
There are no general announcements at this time. |
|||
⚫ | |||
The lab is fully open for use. |
|||
⚫ | |||
ASML Stepper #3 periodic maintenance is complete. System is ready for use. |
|||
⚫ | |||
Peder Lenvik |
|||
⚫ | |||
Problem with load lock gate valve. Currently down. |
|||
Sr. Facilities Lead |
|||
⚫ | |||
// [[User:John_d|Demis D. John]] 23:47, 10 March 2025 (UTC) |
|||
===== |
=====MLA150 is UP===== |
||
System will be available at 12:30 today (Fri Mar 7th). No changes to OAF settings but PAF has moved about 10 points positive for focus. We will work on adjusting PAF back to around 0 (on our cal resist) some time next week. |
|||
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Locating replacement PMT detector. |
|||
-Lee |
|||
⚫ | |||
//[[User:John_d|Demis D. John]] 20:51, 7 March 2025 (UTC) |
|||
=====Stepper #3 (ASML DUV) - Maint Complete ===== |
|||
⚫ | |||
ASML Maintenance is complete, the system is up. |
|||
<!----------------------------------------------> |
|||
// [[User:John_d|Demis D. John]] 02:18, 7 March 2025 (UTC) |
|||
=====RIE #5 Down: Mon March 13th ===== |
|||
RIE #5 will be down Monday March 13th through the end of Wednesday March 15th for maintenance. |
|||
If we complete the job early we will send a follow-up email releasing the system. |
|||
⚫ | |||
=====New Gowns: Toolbelts purchases===== |
|||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase. |
|||
Two vendors for cleanroom belts we are using are listed here, you may request others: |
|||
* [https://www.terrauniversal.com/tool-belt-pocket-49in-waist-white-altessa-grid-uniform-technology-4954-60a.html Uniform Technology Tool Belt] - note the waist size, the 49” belt fits up to ~36-38” waist. |
|||
* [https://www.fishersci.com/shop/products/cleanroom-fannypack-1-ea-white/NC0723118?searchHijack=true&searchTerm=cleanroom-fannypack-1-ea-white&searchType=Rapid&matchedCatNo=NC0723118 HiTEC Fannypack] |
|||
⚫ | |||
⚫ | |||
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests. |
|||
I will send out an update once we have one. |
|||
-Aidan |
|||
⚫ | |||
=====ICP1 Down===== |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
|||
⚫ | |||
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
|||
In order for your post to show up correctly, you need to: |
|||
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
|||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
|||
⚫ | |||
⚫ | |||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
⚫ | |||
⚫ | |||
* You can copy/paste the example below for a new news item. |
|||
⚫ | |||
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
|||
⚫ | |||
⚫ | |||
⚫ | |||
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
|||
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
|||
******** EXAMPLE OF A NEW POST ******** |
|||
===== NanoFab making LN2 icecream ===== |
|||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
|||
⚫ | |||
************* (end of example) ************** |
|||
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
|||
⚫ |
Latest revision as of 19:15, 11 March 2025
EBL Move-In: Tues 9-11a
Users,
Thank you for your patience while we moved the new EBL system in.
The lab is fully open for use.
Peder Lenvik
Sr. Facilities Lead // Demis D. John 23:47, 10 March 2025 (UTC)
MLA150 is UP
System will be available at 12:30 today (Fri Mar 7th). No changes to OAF settings but PAF has moved about 10 points positive for focus. We will work on adjusting PAF back to around 0 (on our cal resist) some time next week. -Lee //Demis D. John 20:51, 7 March 2025 (UTC)
Stepper #3 (ASML DUV) - Maint Complete
ASML Maintenance is complete, the system is up. // Demis D. John 02:18, 7 March 2025 (UTC)
RIE #5 Down: Mon March 13th
RIE #5 will be down Monday March 13th through the end of Wednesday March 15th for maintenance.
If we complete the job early we will send a follow-up email releasing the system.
//Vraj Mehalana 09:46, 21 February 2025 (UTC)
New Gowns: Toolbelts purchases
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase.
Two vendors for cleanroom belts we are using are listed here, you may request others:
- Uniform Technology Tool Belt - note the waist size, the 49” belt fits up to ~36-38” waist.
- HiTEC Fannypack
// Demis D. John 03:34, 3 January 2025 (UTC)
Suss SB6-8E
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.
I will send out an update once we have one. -Aidan // Demis D. John 00:35, 8 December 2024 (UTC)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)