=====PECVD#2 will remain down overnight=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
Unfortunately PECVD2 will remain down overnight.
<!-- Description of the RSS feed -->
''UCSB NanoFab Announcements''
<!--
'''How to add new news items'''


The heater is unable to keep up with the setpoint while running.
* Use level 5 heading for each item - they will show up as separate RSS items this way. (looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~, then after saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. Most recent date shows up at the top.
* "There are no announcements at this time." should be used to indicate when empty.
* Use double-slash at start of new lines - makes display on the Samsung Display look a lot better.
-->
<!---------------------------------------------->
<!------------- Announcements ---------------->
===== Announcements =====
There are no general announcements at this time.
// [[User:John d|Posted: ]] 09:58, 4 January 2018 (PST)


Don and I replaced the heater controller without luck.
===== Gasonics Up =====
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to repaired and returned.
// [[User:John d|Posted:]] 10:14, 12 February 2018 (PST)


I am cooling down the chamber overnight and we will look into the heater coil in the morning.
===== ASML Up =====
//[[User:Mehalana v|Vraj Mehalana]] 03:31, 25 February 2025 (UTC)
ASML Stepper #3 periodic maintenance is complete. System is ready for use.
// [[User:John d|Posted:]] 18:52, 10 February 2018 (PST)


===== JEOL SEM #2 =====
=====Olympus DSX Microscope: UP=====
I have installed a new head and tested it with no problems. Please let me know if you have any questions.
Problem with load lock gate valve. Currently down.
-- Tony Bosch
// [[User:John d|Posted:]] 15:40, 8 February 2018 (PST)
// [[User:John_d|Demis D. John]] 04:57, 25 February 2025 (UTC)


===== Cary 500 =====
=====RIE #5 Down=====
RIE #5 will be down Monday March 13th through the end of Wednesday March 15th for maintenance.
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Locating replacement PMT detector.
// [[User:John d|Posted:]] 15:06, 7 December 2017 (PST)


If we complete the job early we will send a follow-up email releasing the system.
<!---------- end of announcements ------------>

<!---------------------------------------------->
//[[User:Mehalana v|Vraj Mehalana]] 09:46, 21 February 2025 (UTC)

=====Stepper #3 (ASML DUV) - Maint moved to March 3rd=====
We have postponed the Periodic Maintenance (PM) to the week of Monday March 3rd.
Please plan your work accordingly.
// [[User:John_d|Demis D. John]] 19:44, 4 February 2025 (UTC)

=====Oxford ALD+Ion Mill: UP=====
The tool now runs all process temperatures (120-300c).
--Bill Millerski
UCSB
//[[User:John_d|Demis D. John]] 19:48, 4 February 2025 (UTC)

=====New Gowns: Toolbelts purchases=====
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase.

Two vendors for cleanroom belts we are using are listed here, you may request others:
* [https://www.terrauniversal.com/tool-belt-pocket-49in-waist-white-altessa-grid-uniform-technology-4954-60a.html Uniform Technology Tool Belt] - note the waist size, the 49” belt fits up to ~36-38” waist.
* [https://www.fishersci.com/shop/products/cleanroom-fannypack-1-ea-white/NC0723118?searchHijack=true&searchTerm=cleanroom-fannypack-1-ea-white&searchType=Rapid&matchedCatNo=NC0723118 HiTEC Fannypack]

// [[User:John_d|Demis D. John]] 03:34, 3 January 2025 (UTC)

=====Suss SB6-8E=====
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.

I will send out an update once we have one.
-Aidan
// [[User:John_d|Demis D. John]] 00:35, 8 December 2024 (UTC)

=====ICP1 Down=====
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)

<!--
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
In order for your post to show up correctly, you need to:
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
-->
<!---------DO NOT EDIT BELOW THIS LINE----------->
<endfeed />
<endfeed />
<noinclude>[[Category:Templates]]</noinclude>
<noinclude>[[Category:Templates]]</noinclude>
<!--------------------------------------------
====== HOW TO ADD ITEMS ======
* You can copy/paste the example below for a new news item.
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
* Please use "There are no announcements at this time." if the announcements are empty.

* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss


******** EXAMPLE OF A NEW POST ********

===== NanoFab making LN2 icecream =====
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)

************* (end of example) **************
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
---------------------------------------------->

Latest revision as of 04:57, 25 February 2025

PECVD#2 will remain down overnight

Unfortunately PECVD2 will remain down overnight.

The heater is unable to keep up with the setpoint while running.

Don and I replaced the heater controller without luck.

I am cooling down the chamber overnight and we will look into the heater coil in the morning. //Vraj Mehalana 03:31, 25 February 2025 (UTC)

Olympus DSX Microscope: UP

I have installed a new head and tested it with no problems. Please let me know if you have any questions. -- Tony Bosch // Demis D. John 04:57, 25 February 2025 (UTC)

RIE #5 Down

RIE #5 will be down Monday March 13th through the end of Wednesday March 15th for maintenance.

If we complete the job early we will send a follow-up email releasing the system.

//Vraj Mehalana 09:46, 21 February 2025 (UTC)

Stepper #3 (ASML DUV) - Maint moved to March 3rd

We have postponed the Periodic Maintenance (PM) to the week of Monday March 3rd. Please plan your work accordingly. // Demis D. John 19:44, 4 February 2025 (UTC)

Oxford ALD+Ion Mill: UP

The tool now runs all process temperatures (120-300c). --Bill Millerski UCSB //Demis D. John 19:48, 4 February 2025 (UTC)

New Gowns: Toolbelts purchases

We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase.

Two vendors for cleanroom belts we are using are listed here, you may request others:

// Demis D. John 03:34, 3 January 2025 (UTC)

Suss SB6-8E

We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.

I will send out an update once we have one. -Aidan // Demis D. John 00:35, 8 December 2024 (UTC)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)