+ | =====Atomic Force Microscope (Dimension ICON) - 05/17: System UP===== |
||
− | <!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
+ | Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder! |
||
− | <!-- Description of the RSS feed --> |
||
− | ''UCSB NanoFab Announcements'' |
||
⚫ | |||
− | '''How to add new news items''' |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 13:46, 20 May 2024 (PDT) |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
− | ===== Announcements ===== |
||
− | There are no general announcements at this time. |
||
⚫ | |||
− | ===== |
+ | =====MA6 TSA is down - Update===== |
+ | We have received the replacement motor for the TSA Y axis. The FSE will be onsite Monday June 3rd to work on the tool. |
||
− | The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to repaired and returned. |
||
⚫ | |||
+ | The tool remains up for backside alignment and topside exposures that do not require alignment. |
||
⚫ | |||
− | ASML Stepper #3 periodic maintenance is complete. System is ready for use. |
||
− | // [[User:John d|Posted:]] 18:52, 10 February 2018 (PST) |
||
+ | -Lee |
||
⚫ | |||
+ | //15:59, 22 May 2024 (PDT) |
||
− | Problem with load lock gate valve. Currently down. |
||
− | // [[User:John d|Posted:]] 15:40, 8 February 2018 (PST) |
||
− | ===== |
+ | =====Velion FIB Tool DOWN===== |
+ | Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice. |
||
− | UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. |
||
− | // [[User:John d|Posted:]] 13:47, 12 February 2018 (PST) |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT) |
||
⚫ | |||
+ | |||
− | <!----------------------------------------------> |
||
+ | =====Stepper #3 (ASML DUV) - Pneumatics repaired, extra day for optics===== |
||
+ | We were able to repair the pneumatics issue and are currently running reticle and wafer reproducability runs overnight to exercise/test the system. |
||
+ | |||
+ | Consequently the optics was only started today, so will take one day longer than planned - we will extend this visit to Thursday to complete the work. |
||
+ | |||
+ | Sorry for the inconvenience. |
||
+ | |||
+ | //[[User:Mehalana v|Vraj Mehalana]] 19:04, 21 May 2024 (PDT) |
||
+ | |||
⚫ | |||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
+ | |||
+ | =====Lab Access Changes: Symmetry App===== |
||
+ | Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
⚫ | |||
+ | |||
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
||
+ | |||
⚫ | |||
+ | SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
+ | In order for your post to show up correctly, you need to: |
||
+ | >> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
||
+ | >> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
⚫ | |||
⚫ | |||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
⚫ | |||
⚫ | |||
+ | * You can copy/paste the example below for a new news item. |
||
⚫ | |||
+ | * You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
||
⚫ | |||
⚫ | |||
⚫ | |||
+ | |||
+ | * URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
+ | * URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
+ | |||
+ | |||
+ | ******** EXAMPLE OF A NEW POST ******** |
||
+ | |||
+ | ===== NanoFab making LN2 icecream ===== |
||
+ | Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
⚫ | |||
+ | |||
+ | ************* (end of example) ************** |
||
+ | The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
||
⚫ |
Latest revision as of 15:59, 22 May 2024
Atomic Force Microscope (Dimension ICON) - 05/17: System UP
Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!
//Vraj Mehalana 13:46, 20 May 2024 (PDT)
MA6 TSA is down - Update
We have received the replacement motor for the TSA Y axis. The FSE will be onsite Monday June 3rd to work on the tool.
The tool remains up for backside alignment and topside exposures that do not require alignment.
-Lee //15:59, 22 May 2024 (PDT)
Velion FIB Tool DOWN
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
//Vraj Mehalana 10:58, 30 April 2024 (PDT)
Stepper #3 (ASML DUV) - Pneumatics repaired, extra day for optics
We were able to repair the pneumatics issue and are currently running reticle and wafer reproducability runs overnight to exercise/test the system.
Consequently the optics was only started today, so will take one day longer than planned - we will extend this visit to Thursday to complete the work.
Sorry for the inconvenience.
//Vraj Mehalana 19:04, 21 May 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)