Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
m (→‎Gasonics: Up: grammar)
 
(864 intermediate revisions by 8 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!-- Description of the RSS feed -->
 
''UCSB NanoFab Announcements''
 
<!--
 
'''How to add new news items'''
 
   
  +
=====MA6 is up=====
* Use level 5 heading for each item - they will show up as separate RSS items this way. (looks best on the Wiki homepage)
 
  +
JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed.
* You must add a user signature at the end of each post via four tildes: ~~~~, then after saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. Most recent date shows up at the top.
 
* "There are no announcements at this time." should be used to indicate when empty.
 
* Use double-slash at start of new lines - makes display on the Samsung Display look a lot better.
 
-->
 
<!---------------------------------------------->
 
<!------------- Announcements ---------------->
 
===== Announcements =====
 
There are no general announcements at this time.
 
// [[User:John d|Posted: ]] 09:58, 4 January 2018 (PST)
 
   
  +
//17:16, 13 June 2024 (PDT)
===== ICP#1: Up =====
 
He cooling fixed.
 
// [[User:John d|Posted:]] 01:32, 15 February 2018 (PST)
 
   
===== JEOL SEM #2: Up =====
+
=====(JEOL JBX-6300FS) - 06/13: System still DOWN=====
  +
JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed.
System up for use. JEOL service returning on Tues for permanent fix.
 
// [[User:John d|Posted:]] 22:30, 16 February 2018 (PST)
 
   
  +
//17:15, 13 June 2024 (PDT)
===== Gasonics: Up =====
 
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to be repaired and returned.
 
// [[User:John d|Posted:]] 10:14, 12 February 2018 (PST)
 
   
===== Cary 500 Down =====
+
=====MLA Maintenance 6/24-6/27=====
  +
The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options.
 
  +
evenings.
// [[User:John d|Posted:]] 13:47, 12 February 2018 (PST)
 
  +
-Lee
  +
//15:59, 4 June 2024 (PDT)
   
  +
<!---------- end of announcements ------------>
 
  +
=====Stepper #1 (GCA 6300) - Tool availability=====
<!---------------------------------------------->
 
  +
Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:
  +
  +
6-18-24 at 8:00am
  +
Till
  +
6-20-24 at 5:00pm
  +
  +
Please plan your processing activities accordingly.
  +
//13:32, 1 June 2024 (PDT)
  +
  +
=====Stepper #2 (GCA Autostep 200) - Tool availability=====
  +
Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:
  +
  +
6-21-24 at 8:00am
  +
Till
  +
6-21-24 at 5:00pm
  +
  +
Please plan your processing activities accordingly.
  +
  +
Thanks
  +
Bill Millerski
  +
UCSB
  +
//13:32, 1 June 2024 (PDT)
  +
  +
  +
=====Velion FIB Tool DOWN=====
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
  +
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
  +
  +
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
The iris scanner has been decommissioned. Please use the card reader which supports:
  +
  +
-Physical card
  +
  +
-Mobile phone via Symmetry App
  +
  +
//10:54, 23 May 2024 (PDT)
  +
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
  +
  +
<!--
  +
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
  +
In order for your post to show up correctly, you need to:
  +
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
  +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
  +
-->
  +
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<noinclude>[[Category:Templates]]</noinclude>
  +
<!--------------------------------------------
  +
====== HOW TO ADD ITEMS ======
  +
* You can copy/paste the example below for a new news item.
  +
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
  +
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
  +
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
  +
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
  +
* Please use "There are no announcements at this time." if the announcements are empty.
  +
  +
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  +
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  +
  +
  +
******** EXAMPLE OF A NEW POST ********
  +
  +
===== NanoFab making LN2 icecream =====
  +
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
  +
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
  +
  +
************* (end of example) **************
  +
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
  +
---------------------------------------------->

Latest revision as of 17:16, 13 June 2024

MA6 is up

JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed.

//17:16, 13 June 2024 (PDT)

(JEOL JBX-6300FS) - 06/13: System still DOWN

JEOL Service will be here tomorrow morning to look at the situation. They had me try a couple of things today that didn't work. It is pointing to a gun replacement at this point. They do a have a spare gun at the JEOL facility in Pittsburgh ready to go if needed.

//17:15, 13 June 2024 (PDT)

MLA Maintenance 6/24-6/27

The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the evenings. -Lee //15:59, 4 June 2024 (PDT)


Stepper #1 (GCA 6300) - Tool availability

Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:

6-18-24 at 8:00am Till 6-20-24 at 5:00pm

Please plan your processing activities accordingly. //13:32, 1 June 2024 (PDT)

Stepper #2 (GCA Autostep 200) - Tool availability

Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:

6-21-24 at 8:00am Till 6-21-24 at 5:00pm

Please plan your processing activities accordingly.

Thanks Bill Millerski UCSB //13:32, 1 June 2024 (PDT)


Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//10:54, 23 May 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)