Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
Content deleted Content added
adt update |
mNo edit summary |
||
| (979 intermediate revisions by 8 users not shown) | |||
| Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
<!--feedBurner name="UCSBNanofab-Announcements" /--> |
|||
<!-- Description of the RSS feed --> |
|||
''UCSB NanoFab Announcements'' |
|||
| ⚫ | |||
'''How to add new news items''' |
|||
=====Christmas Lab Shutdown: Dec 22-25===== |
|||
| ⚫ | |||
Users, |
|||
| ⚫ | |||
To perform annual maintenance, we are planning to have the lab shut down from '''''9 am on Monday December 22 through 9 am Friday December 26th'''''. |
|||
| ⚫ | |||
| ⚫ | |||
Please plan accordingly. |
|||
- Peder Lenvik |
|||
| ⚫ | |||
=====Announcements moved===== |
|||
Please check the announcements in SignupMonkey for equipment notifications. |
|||
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC) |
|||
| ⚫ | |||
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
|||
In order for your post to show up correctly, you need to: |
|||
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
|||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
|||
--> |
--> |
||
<!--------- |
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
||
| ⚫ | |||
| ⚫ | |||
| ⚫ | |||
===== ADT Dicing Saw: Intermittent Software Issue ===== |
|||
| ⚫ | |||
One of the DB files keeps getting corrupted. We've restored the system back to the backup created yesterday afternoon and the saw is up and running. Looking into a longer term fix. If you created a new recipe within the last 5 days you may need to re-create it. |
|||
====== HOW TO ADD ITEMS ====== |
|||
| ⚫ | |||
* You can copy/paste the example below for a new news item. |
|||
| ⚫ | |||
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
|||
| ⚫ | |||
| ⚫ | |||
| ⚫ | |||
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
|||
===== EBeam #4: Re-Training Required ===== |
|||
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
|||
The upgrade is complete and working well. All users will be required |
|||
to be trained again. The high voltage, sweep and turret controls are |
|||
all new. |
|||
// [[User:John d|John d]] 12:13, 26 March 2018 (PDT) |
|||
===== PECVD #2: UP with possible High Particulates ===== |
|||
We are still experiencing high particle counts in the Advanced Vacuum |
|||
PECVD process. Our next step is to replace the Silane MFC. I will |
|||
update you once I have a lead time on the new MFC. Most likely it will |
|||
take several weeks to receive. Until then, the system is operational |
|||
and can be used if your process is not sensitive to high particle |
|||
counts. |
|||
// [[User:John d|Posted:]] 13:22, 19 March 2018 (PDT) |
|||
******** EXAMPLE OF A NEW POST ******** |
|||
===== Gasonics: Up ===== |
|||
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to be repaired and returned. |
|||
// [[User:John d|Posted:]] 10:14, 12 February 2018 (PST) |
|||
===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
|||
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. |
|||
// [[User: |
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) |
||
************* (end of example) ************** |
|||
<!---------- end of announcements ------------> |
|||
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
|||
| ⚫ | |||
| ⚫ | |||
| ⚫ | |||
| ⚫ | |||
Latest revision as of 06:39, 3 December 2025
Christmas Lab Shutdown: Dec 22-25
Users, To perform annual maintenance, we are planning to have the lab shut down from 9 am on Monday December 22 through 9 am Friday December 26th.
Please plan accordingly. - Peder Lenvik // Demis D. John 02:03, 27 November 2025 (UTC)
Announcements moved
Please check the announcements in SignupMonkey for equipment notifications. // Demis D. John 02:03, 27 November 2025 (UTC)