Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(MA-6 down)
 
(728 intermediate revisions by 8 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
  +
=====EBeam4 Update - Still down=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
EBeam4 will remain down overnight.
<!-- Description of the RSS feed -->
 
''UCSB NanoFab Announcements''
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
 
-->
 
<!---------------------------------------------->
 
<!------------- Announcements ---------------->
 
   
  +
The new motor arrived as well as the new junction box and new cables.
===== LAB OPEN =====
 
The campus cooling water system is back up and the humidity levels are back to normal. The lab is open for use.
 
// [[User:John d|John d]] 10:22, 6 July 2018 (PDT)
 
   
  +
I removed the old junction box/plugs due to a lot of corrosion inside the box caused by it being located directly under the water supply lines.
===== MA-6 Aligner: Down =====
 
The top side microscope will not move. Working with vendor to correct the problem.
 
// [[User:John d|John d]] 13:21, 6 July 2018 (PDT)
 
   
  +
This corrosion inside the box could have contributed to the failure of the old motor.
===== PECVD#1: Software Upgrade =====
 
We are going to upgrade the computer and software on PECVD#1 in 2–3 weeks. The tool will be down for three to five days. Once the upgrade is complete, everyone will need to be retrained on the new software. You should start planning accordingly, if you use this tool. We will send out an email when we know the exact dates.
 
// [[User:John d|John d]] 15:05, 20 June 2018 (PDT)
 
   
  +
I installed the new motor, ran all new cables to the new junction box in it's new location away from the water lines.
===== AFM: Up =====
 
AFM head has been returned from service, system is up for use. Please notify NanoFab@ece.ucsb.edu if you experience any problems with it.
 
// [[User:John d|John d]] 17:24, 15 June 2018 (PDT)
 
   
  +
I was able to test the function of the hoist by raising and lowering the bell jar while in manual mode.
===== RIE#5: SiCl4 Issue =====
 
We have a flow rate problem on the SiCl4 gas line. You can only flow the SiCl4 for 5 minutes and then you have to wait 5 minutes before you flow it again. So in order to to do a 10 minute Etch you will have to do it in three steps flow 5 mi, wait 5mi, then flow 5min.
 
// [[User:John d|John d]] 17:22, 15 June 2018 (PDT)
 
   
  +
For safety reasons, I had the machine powered off during the duration of the work being done, so the cryo will be in regen overnight.
===== Solvent Bench Bay 7 - Heated Bath =====
 
We have disabled the auto refill due to a high water level. Please use the manual fill and a manual drain button at the center top of the head case. Users of the bath might need to fill or drain as you insert/remove your beakers. Please be careful with other user's beakers.
 
// [[User:John d|John d]] 17:18, 6 June 2018 (PDT)
 
   
  +
Tomorrow morning I will continue testing the system to ensure everything is working properly before I release the tool.
<!---------- end of announcements ------------>
 
<!---------------------------------------------->
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
   
  +
I will send another email when an update is available.
   
  +
//10:36, 30 May 2024 (PDT)
   
  +
=====Stepper #3 (ASML DUV) - System UP and calibrated=====
  +
We have finished calibrations,
  +
System is up.
   
  +
Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose.
====== HOW TO ADD NEWS ITEMS ======
 
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT)
  +
  +
=====Atomic Force Microscope (Dimension ICON) - 05/17: System UP=====
  +
Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!
  +
  +
//[[User:Mehalana v|Vraj Mehalana]] 13:46, 20 May 2024 (PDT)
  +
  +
=====MA6 TSA is down - Update=====
  +
We have received the replacement motor for the TSA Y axis. The FSE will be onsite Monday June 3rd to work on the tool.
  +
  +
The tool remains up for backside alignment and topside exposures that do not require alignment.
  +
  +
-Lee
  +
//15:59, 22 May 2024 (PDT)
  +
  +
=====Velion FIB Tool DOWN=====
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
  +
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
  +
  +
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
The iris scanner has been decommissioned. Please use the card reader which supports:
  +
  +
-Physical card
  +
  +
-Mobile phone via Symmetry App
  +
  +
//10:54, 23 May 2024 (PDT)
  +
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
  +
  +
<!--
  +
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
  +
In order for your post to show up correctly, you need to:
  +
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
  +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
  +
-->
  +
<!---------DO NOT EDIT BELOW THIS LINE----------->
  +
<endfeed />
  +
<noinclude>[[Category:Templates]]</noinclude>
  +
<!--------------------------------------------
  +
====== HOW TO ADD ITEMS ======
  +
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
+
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
  +
  +
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  +
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
   
   
Line 55: Line 90:
 
===== NanoFab making LN2 icecream =====
 
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
  +
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
// ~~~~
 
   
(end of example)
+
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
+
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
 
---------------------------------------------->
 
---------------------------------------------->

Latest revision as of 10:36, 30 May 2024

EBeam4 Update - Still down

EBeam4 will remain down overnight.

The new motor arrived as well as the new junction box and new cables.

I removed the old junction box/plugs due to a lot of corrosion inside the box caused by it being located directly under the water supply lines.

This corrosion inside the box could have contributed to the failure of the old motor.

I installed the new motor, ran all new cables to the new junction box in it's new location away from the water lines.

I was able to test the function of the hoist by raising and lowering the bell jar while in manual mode.

For safety reasons, I had the machine powered off during the duration of the work being done, so the cryo will be in regen overnight.

Tomorrow morning I will continue testing the system to ensure everything is working properly before I release the tool.

I will send another email when an update is available.

//10:36, 30 May 2024 (PDT)

Stepper #3 (ASML DUV) - System UP and calibrated

We have finished calibrations, System is up.

Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose.

//Vraj Mehalana 11:17, 24 May 2024 (PDT)

Atomic Force Microscope (Dimension ICON) - 05/17: System UP

Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!

//Vraj Mehalana 13:46, 20 May 2024 (PDT)

MA6 TSA is down - Update

We have received the replacement motor for the TSA Y axis. The FSE will be onsite Monday June 3rd to work on the tool.

The tool remains up for backside alignment and topside exposures that do not require alignment.

-Lee //15:59, 22 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//10:54, 23 May 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)