Template:Announcements: Difference between revisions
(gasonics down) |
Mehalana v (talk | contribs) |
||
(785 intermediate revisions by 8 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
<!--feedBurner name="UCSBNanofab-Announcements" /--> |
|||
<!-- Description of the RSS feed --> |
|||
''UCSB NanoFab Announcements'' |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
===== |
=====RIE #5 Down===== |
||
RIE #5 will be down Monday March 13th through the end of Wednesday March 15th for maintenance. |
|||
Still troubleshooting, awaiting spare parts. |
|||
⚫ | |||
If we complete the job early we will send a follow-up email releasing the system. |
|||
===== EBeam #2: Scheduled Maintenance ===== |
|||
On Monday the 17th, EB2 will be down all day for modifications. If possible we will have the system up and running by the end of the day either in it's modified form or as it is now. Please plan accordingly |
|||
// [[User:John d|John d]] 17:13, 12 September 2018 (PDT) |
|||
//[[User:Mehalana v|Vraj Mehalana]] 09:46, 21 February 2025 (UTC) |
|||
===== RIE#5: Software Upgrades ===== |
|||
[[RIE_5_(PlasmaTherm)|RIE#5]] Will be down next week from approximately Monday Sept. 17th to Thursday Sept. 20th, for a software upgrade to the same software running on the other PlasmaTherm tools. |
|||
All users will need to be retrained after the upgrade is complete. |
|||
// [[User:John d|John d]] 15:16, 11 September 2018 (PDT) |
|||
===== |
=====Olympus DSX Microscope: Down===== |
||
After speaking with Olympus it looks like there is a problem with the polarizer that is interfering with basic system initialization. I'm waiting for the repair quote and will update everyone when we know more. |
|||
Plasmatherm will be upgrading the system software on September 17th. The upgrade will take 3-5 days. After the upgrade is complete, everyone must be re-certified to use the tool. Please document any custom recipes that you may have, in case they can't be copied over. |
|||
-- Tony Bosch |
|||
// [[User:John d|John d]] 06:38, 15 August 2018 (PDT) |
|||
// [[User:John_d|Demis D. John]] 20:41, 5 February 2025 (UTC) |
|||
===== |
=====Stepper #3 (ASML DUV) - Maint moved to March 3rd===== |
||
We have postponed the Periodic Maintenance (PM) to the week of Monday March 3rd. |
|||
We have a flow rate problem on the SiCl4 gas line. You can only flow the SiCl4 for 5 minutes and then you have to wait 5 minutes before you flow it again. So in order to to do a 10 minute Etch you will have to do it in three steps flow 5 mi, wait 5mi, then flow 5min. |
|||
Please plan your work accordingly. |
|||
// [[User:John d|John d]] 17:22, 15 June 2018 (PDT) |
|||
// [[User:John_d|Demis D. John]] 19:44, 4 February 2025 (UTC) |
|||
=====Oxford ALD+Ion Mill: UP===== |
|||
<!---------- end of announcements ------------> |
|||
The tool now runs all process temperatures (120-300c). |
|||
<!----------------------------------------------> |
|||
--Bill Millerski |
|||
⚫ | |||
UCSB |
|||
⚫ | |||
//[[User:John_d|Demis D. John]] 19:48, 4 February 2025 (UTC) |
|||
<!-------------------------------------------- |
|||
=====New Gowns: Toolbelts purchases===== |
|||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase. |
|||
Two vendors for cleanroom belts we are using are listed here, you may request others: |
|||
* [https://www.terrauniversal.com/tool-belt-pocket-49in-waist-white-altessa-grid-uniform-technology-4954-60a.html Uniform Technology Tool Belt] - note the waist size, the 49” belt fits up to ~36-38” waist. |
|||
* [https://www.fishersci.com/shop/products/cleanroom-fannypack-1-ea-white/NC0723118?searchHijack=true&searchTerm=cleanroom-fannypack-1-ea-white&searchType=Rapid&matchedCatNo=NC0723118 HiTEC Fannypack] |
|||
// [[User:John_d|Demis D. John]] 03:34, 3 January 2025 (UTC) |
|||
===== |
=====Suss SB6-8E===== |
||
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests. |
|||
I will send out an update once we have one. |
|||
-Aidan |
|||
// [[User:John_d|Demis D. John]] 00:35, 8 December 2024 (UTC) |
|||
=====ICP1 Down===== |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
|||
⚫ | |||
⚫ | |||
In order for your post to show up correctly, you need to: |
|||
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
|||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
====== HOW TO ADD ITEMS ====== |
|||
* You can copy/paste the example below for a new news item. |
|||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
* You must add a user signature at the end of each post via four tildes: |
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
||
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
||
* Please use "There are no announcements at this time." if the announcements are empty. |
* Please use "There are no announcements at this time." if the announcements are empty. |
||
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
|||
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
|||
Line 52: | Line 70: | ||
===== NanoFab making LN2 icecream ===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
⚫ | |||
// ~~~~ |
|||
(end of example) |
************* (end of example) ************** |
||
The |
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
||
----------------------------------------------> |
----------------------------------------------> |
Latest revision as of 22:01, 21 February 2025
RIE #5 Down
RIE #5 will be down Monday March 13th through the end of Wednesday March 15th for maintenance.
If we complete the job early we will send a follow-up email releasing the system.
//Vraj Mehalana 09:46, 21 February 2025 (UTC)
Olympus DSX Microscope: Down
After speaking with Olympus it looks like there is a problem with the polarizer that is interfering with basic system initialization. I'm waiting for the repair quote and will update everyone when we know more. -- Tony Bosch // Demis D. John 20:41, 5 February 2025 (UTC)
Stepper #3 (ASML DUV) - Maint moved to March 3rd
We have postponed the Periodic Maintenance (PM) to the week of Monday March 3rd. Please plan your work accordingly. // Demis D. John 19:44, 4 February 2025 (UTC)
Oxford ALD+Ion Mill: UP
The tool now runs all process temperatures (120-300c). --Bill Millerski UCSB //Demis D. John 19:48, 4 February 2025 (UTC)
New Gowns: Toolbelts purchases
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase.
Two vendors for cleanroom belts we are using are listed here, you may request others:
- Uniform Technology Tool Belt - note the waist size, the 49” belt fits up to ~36-38” waist.
- HiTEC Fannypack
// Demis D. John 03:34, 3 January 2025 (UTC)
Suss SB6-8E
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.
I will send out an update once we have one. -Aidan // Demis D. John 00:35, 8 December 2024 (UTC)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)