Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Content deleted Content added
updates to RIE5, PECVD1
No edit summary
 
(841 intermediate revisions by 7 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />
=====Oxford Flexal ALD=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
The PM is proceeding slower than expected. As such, I currently anticipate that the tool will be available for use by the end of the day on Friday.
<!-- Description of the RSS feed -->
''UCSB NanoFab Announcements''
<!--
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
-->
<!---------------------------------------------->
<!------------- Announcements ---------------->


Sorry for any inconvenience this may cause.
===== RIE#5: Software Upgrades =====
[[RIE_5_(PlasmaTherm)|RIE#5]] system has undergone a software upgrade.
All users will need to be retrained to use the new Cortex software.
// [[User:John d|John d]] 14:39, 16 October 2018 (PDT)


Thanks
===== PECVD#1: Software Upgrade =====
Bill Millerski
Software upgrade completed, everyone must be re-certified to use the tool. All old recipe files have been backed up but not reinstated - let us know if you need your old recipe parameters.
// [[User:John d|John d]] 14:39, 16 October 2018 (PDT)
//[[User:Mehalana v|Vraj Mehalana]] 21:12, 12 August 2025 (UTC)


===== CARY500 - Down - Decomissioned =====
=====Suss SB6-8E=====
This tool is down indefinitely. We are sourcing manual bonding fixtures, and already have a 1cm bonding fixture for NanoFab users to use - please contact [[Demis D. John]] for more information.
CARY 500 Spectrophotometer has failed - Will not be repaired - being decomissioned. New Filmetrics F10-RT-UVX being ordered as a replacement.
// [[User:Thibeault|Thibeault]] 16:40, 26 September 2018 (PDT)
// [[User:John_d|Demis D. John]] 04:28, 5 August 2025 (UTC)


===== RIE#5: SiCl4 Issue =====
=====ICP1 Down=====
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
We have a flow rate problem on the SiCl4 gas line. You can only flow the SiCl4 for 5 minutes and then you have to wait 5 minutes before you flow it again. So in order to to do a 10 minute Etch you will have to do it in three steps flow 5 mi, wait 5mi, then flow 5min.
// [[User:John d|John d]] 17:22, 15 June 2018 (PDT)
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)


<!--

SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
<!---------- end of announcements ------------>
In order for your post to show up correctly, you need to:
<!---------------------------------------------->
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
-->
<!---------DO NOT EDIT BELOW THIS LINE----------->
<endfeed />
<endfeed />
<noinclude>[[Category:Templates]]</noinclude>
<noinclude>[[Category:Templates]]</noinclude>
<!--------------------------------------------
<!--------------------------------------------
====== HOW TO ADD ITEMS ======

* You can copy/paste the example below for a new news item.



====== HOW TO ADD NEWS ITEMS ======

* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
* Please use "There are no announcements at this time." if the announcements are empty.
* Please use "There are no announcements at this time." if the announcements are empty.

* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss




Line 49: Line 43:
===== NanoFab making LN2 icecream =====
===== NanoFab making LN2 icecream =====
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
// ~~~~


(end of example)
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
---------------------------------------------->
---------------------------------------------->

Latest revision as of 22:24, 13 August 2025

Oxford Flexal ALD

The PM is proceeding slower than expected. As such, I currently anticipate that the tool will be available for use by the end of the day on Friday.

Sorry for any inconvenience this may cause.

Thanks Bill Millerski //Vraj Mehalana 21:12, 12 August 2025 (UTC)

Suss SB6-8E

This tool is down indefinitely. We are sourcing manual bonding fixtures, and already have a 1cm bonding fixture for NanoFab users to use - please contact Demis D. John for more information. // Demis D. John 04:28, 5 August 2025 (UTC)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)