<!--feedBurner name="UCSBNanofab-Announcements" /--> |
|||
The PM is proceeding slower than expected. As such, I currently anticipate that the tool will be available for use by the end of the day on Friday. |
|||
<!-- Description of the RSS feed --> |
|||
''Equipment Status'' |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
Sorry for any inconvenience this may cause. |
|||
===== Unaxis ICP-PECVD ===== |
|||
The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. |
|||
⚫ | |||
Thanks |
|||
===== Cleanroom Shutdown on 11/21 ===== |
|||
Bill Millerski |
|||
The cleanroom will be closed from 7-9am on Thursday, November 21st for fire system testing. No one will be allowed in the lab during this time. Please plan accordingly. |
|||
[[User: |
//[[User:Mehalana v|Vraj Mehalana]] 21:12, 12 August 2025 (UTC) |
||
===== |
=====E-Beam #2 is down - Update===== |
||
The replacement cyro pump had a leak in the N2 purge connection. After that was sorted out I was able to get the cryo going. However, it appears there is an issue with this cryo as it is pumping very slow. I am going to let it pump overnight but will most likely change it out in the morning. As of right now, no ETA on when the tool will be available. |
|||
Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. |
|||
[[User:Silva|Silva]] 11:16, 25 October 2019 (PDT) |
|||
-Lee |
|||
//[[User:Mehalana v|Vraj Mehalana]] 21:14, 4 August 2025 (UTC) |
|||
=====ALD: Chamber 1===== |
|||
<!---------- end of Equipment Status ------------> |
|||
I will be back on Thursday. In the meantime, the users can run the BDEAS recipe on the other chamber. |
|||
<!----------------------------------------------> |
|||
//[[User:Mehalana v|Vraj Mehalana]] 21:13, 4 August 2025 (UTC) |
|||
⚫ | |||
⚫ | |||
<!-------------------------------------------- |
|||
=====MLA Up===== |
|||
The MLA is up, service has finished. OptAF is in-spec, but PneuAF currently has a shift down to -18 defocus - you will need to adjust your focus via FEM calibration. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 21:13, 4 August 2025 (UTC) |
|||
=====EBeam1 is UP===== |
|||
EBeam1 is back UP |
|||
Late this morning, the hoist motor was finally delivered, and as soon as it arrived I started the installation. |
|||
I then tested the Egun operation due to the new high voltage feed throughs that were installed earlier this week. |
|||
All tests were completed without issue. System UP. |
|||
⚫ | |||
// 04:23, 25 July 2025 (UTC) |
|||
===== SignupMonkey + Wiki: Off-Campus Access===== |
|||
Due to a DDoS attack affecting the Signupmonkey server, we have restricted access to the website to US locations only, including both the Nanofab Wiki and Signupmonkey. |
|||
If you are off-campus and experiencing issues, please utilize the UCSB VPN to access our sites. Here are the installation instructions for VPN on your device. You will need your UCSB NetID for download and installation - you would have received a UCSB NetID when you started using the NanoFab: |
|||
https://it.ucsb.edu/ivanti-secure-access-campus-vpn/get-connected-campus-vpn |
|||
-- Vraj |
|||
// [[User:John_d|Demis D. John]] 20:08, 22 April 2025 (UTC) |
|||
=====Suss SB6-8E===== |
|||
This tool is down indefinitely. We are sourcing manual bonding fixtures, and already have a 1cm bonding fixture for NanoFab users to use - please contact [[Demis D. John]] for more information. |
|||
// [[User:John_d|Demis D. John]] 04:28, 5 August 2025 (UTC) |
|||
=====ICP1 Down===== |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
|||
⚫ | |||
⚫ | |||
In order for your post to show up correctly, you need to: |
|||
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
|||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
* You can copy/paste the example below for a new news item. |
* You can copy/paste the example below for a new news item. |
||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
* You must add a user signature at the end of each post via four tildes: |
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
||
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
||
* Please use "There are no announcements at this time." if the announcements are empty. |
* Please use "There are no announcements at this time." if the announcements are empty. |
||
* URL to the RSS feed via FeedBurner (for Samsung display): http:// |
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
* URL to the RSS feed directly from Wiki: https:// |
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
Line 48: | Line 76: | ||
===== NanoFab making LN2 icecream ===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
⚫ | |||
// ~~~~ |
|||
************* (end of example) ************** |
************* (end of example) ************** |
||
The |
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
||
----------------------------------------------> |
----------------------------------------------> |
Latest revision as of 21:12, 12 August 2025
Oxford Flexal
The PM is proceeding slower than expected. As such, I currently anticipate that the tool will be available for use by the end of the day on Friday.
Sorry for any inconvenience this may cause.
Thanks Bill Millerski //Vraj Mehalana 21:12, 12 August 2025 (UTC)
E-Beam #2 is down - Update
The replacement cyro pump had a leak in the N2 purge connection. After that was sorted out I was able to get the cryo going. However, it appears there is an issue with this cryo as it is pumping very slow. I am going to let it pump overnight but will most likely change it out in the morning. As of right now, no ETA on when the tool will be available.
-Lee //Vraj Mehalana 21:14, 4 August 2025 (UTC)
ALD: Chamber 1
I will be back on Thursday. In the meantime, the users can run the BDEAS recipe on the other chamber. //Vraj Mehalana 21:13, 4 August 2025 (UTC)
MLA Up
The MLA is up, service has finished. OptAF is in-spec, but PneuAF currently has a shift down to -18 defocus - you will need to adjust your focus via FEM calibration. //Vraj Mehalana 21:13, 4 August 2025 (UTC)
EBeam1 is UP
EBeam1 is back UP
Late this morning, the hoist motor was finally delivered, and as soon as it arrived I started the installation. I then tested the Egun operation due to the new high voltage feed throughs that were installed earlier this week.
All tests were completed without issue. System UP. // 04:23, 25 July 2025 (UTC)
SignupMonkey + Wiki: Off-Campus Access
Due to a DDoS attack affecting the Signupmonkey server, we have restricted access to the website to US locations only, including both the Nanofab Wiki and Signupmonkey.
If you are off-campus and experiencing issues, please utilize the UCSB VPN to access our sites. Here are the installation instructions for VPN on your device. You will need your UCSB NetID for download and installation - you would have received a UCSB NetID when you started using the NanoFab:
https://it.ucsb.edu/ivanti-secure-access-campus-vpn/get-connected-campus-vpn
-- Vraj // Demis D. John 20:08, 22 April 2025 (UTC)
Suss SB6-8E
This tool is down indefinitely. We are sourcing manual bonding fixtures, and already have a 1cm bonding fixture for NanoFab users to use - please contact Demis D. John for more information. // Demis D. John 04:28, 5 August 2025 (UTC)
ICP1 Down