Template:Announcements: Difference between revisions
No edit summary |
|||
(428 intermediate revisions by 7 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
<!--feedBurner name="UCSBNanofab-Announcements" /--> |
|||
<!-- Description of the RSS feed --> |
|||
'''''Important Announcements''''' |
|||
⚫ | |||
<!-- |
|||
⚫ | |||
=====Lab Shutdown: Dec 26 to Jan 3rd===== |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
<!------------- Equipment Status ----------------> |
|||
We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed. |
|||
===== Oxford ICP Installed ===== |
|||
A new ICP etcher for III-V etches (GaAs, InP, GaN) has been installed: [[Oxford_ICP_Etcher_(PlasmaPro_100_Cobra)]] |
|||
During the shutdown this year we will be pulling all cleanroom suits and stocking new suits. |
|||
Contact [[Tony_Bosch | the supervisor]] for training. |
|||
⚫ | |||
PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH |
|||
===== New UC system-wide Flu Vaccine mandate ===== |
|||
The UC Office of the President has issued an executive order making influenza vaccinations mandatory for all UC students and employees. The order, effective throughout the 2021-22 flu season, requires that all students and faculty and staff members who live, learn or work on any UC campus or want to access any UC facilities attest that they have received a flu vaccination, or have chosen to decline a vaccination, no later than November 19. Declining the vaccination will require use of masks indoors throughout the flu season. |
|||
⚫ | |||
All facility users are covered under this mandate. |
|||
//[[User:Thibeault|Thibeault]] 11:26, 27 October 2021 (PDT) |
|||
===== |
=====New Gowns in Jan===== |
||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. |
|||
The Nanofab will be closed from Friday, December 24th at 6pm until Monday, January 3rd at 6a. We will be performing our yearly preventative maintenance. Users will not be allowed in the lab during this time. |
|||
//[[User: |
// [[User:John_d|Demis D. John]] 16:58, 24 November 2024 (UTC) |
||
===== |
=====Suss SB6-8E===== |
||
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed. |
|||
All facility users and visitors are now required to have masks on while indoors in shared spaces. This includes shared offices, hallways/corridors, and all shared laboratory spaces. Masks will be worn in all laboratories at all times and in all shared office spaces at all times. |
|||
-Aidan |
|||
This direction applies to all vaccinated and non-vaccinated persons. |
|||
⚫ | |||
=====ICP1 Down===== |
|||
Outdoor policies remain unchanged |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
|||
=====Lab Access Changes: Symmetry App===== |
|||
Surgical style masks or KN95 masks are appropriate for cleanroom use. Cloth masks may be used in non-cleanroom spaces. |
|||
The iris scanner has been decommissioned. Please use the card reader which supports: |
|||
-Physical card |
|||
See the full policies at [[COVID-19_User_Policies]] |
|||
-Mobile phone via Symmetry App |
|||
// [[User:Hopkins a|Hopkins a]] 08:14, 6 August 2021 (PDT) |
|||
⚫ | |||
===== Weekly Testing strongly urged for UCSB Students/Staff ===== |
|||
Free weekly COVID testing is available to UCSB Staff, Faculty and Students. UCSB employees are strongly urged to sign up for weekly testing, which takes only minutes, is administered on-campus and is free of charge. |
|||
⚫ | |||
Weekly recurring appointments can be made at the Student Health website: |
|||
⚫ | |||
* Log on to the [https://studenthealthoc.sa.ucsb.edu/login_dualauthentication.aspx '''UCSB Testing Patient Portal'''] using your UCSB NetID and password. |
|||
⚫ | |||
⚫ | |||
The Chancellor's [https://chancellor.ucsb.edu/memos/2020-10-15-recommended-covid-19-asymptomatic-campus-testing-program-faculty-staff-and memo to campus with details can be found here]. |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
===== NanoFab COVID Protocols ===== |
|||
''The most recent COVID Protocols can be found at '''[[COVID-19_User_Policies]]'''.'' |
|||
⚫ | |||
<!---------- end of Equipment Status ------------> |
|||
<!----------------------------------------------> |
|||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
<!-------------------------------------------- |
<!-------------------------------------------- |
||
⚫ | |||
⚫ | |||
* You can copy/paste the example below for a new news item. |
* You can copy/paste the example below for a new news item. |
||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
* You must add a user signature at the end of each post via four tildes: |
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
||
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
||
* Please use "There are no announcements at this time." if the announcements are empty. |
* Please use "There are no announcements at this time." if the announcements are empty. |
||
* URL to the RSS feed via FeedBurner (for Samsung display): http:// |
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
* URL to the RSS feed directly from Wiki: https:// |
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
Line 85: | Line 60: | ||
===== NanoFab making LN2 icecream ===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) |
|||
// ~~~~ |
|||
************* (end of example) ************** |
************* (end of example) ************** |
||
The |
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
||
----------------------------------------------> |
----------------------------------------------> |
Latest revision as of 16:58, 24 November 2024
Lab Shutdown: Dec 26 to Jan 3rd
We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.
During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.
PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH
//Demis D. John 16:55, 24 November 2024 (UTC)
New Gowns in Jan
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. // Demis D. John 16:58, 24 November 2024 (UTC)
Suss SB6-8E
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)