Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(Deleted Flu vacc. mandate)
 
(417 intermediate revisions by 7 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />
<!--feedBurner name="UCSBNanofab-Announcements" /-->
<!-- Description of the RSS feed -->
'''''Important Announcements'''''
----
<!--
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.


=====Lab Shutdown: Dec 26 to Jan 3rd=====
In order for your post to show up correctly, you need to:
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
-->
<!---------------------------------------------->
<!------------- Equipment Status ---------------->
===== Jan 2022 UCSB COVID Protocols =====
See the UCSB Email for [https://t.e2ma.net/webview/ftggrf/f0886911cb138b340f9d784d1035be8a Jan 2022 Return to Campus] for full information. Useful links are pasted below.


We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.
* All students who will be on campus during Winter Quarter are required to obtain a campus COVID-19 test at the beginning of the quarter.


During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.
* [https://t.e2ma.net/click/bmsprf/bafvpn/r6ygiy Testing is available] to the campus community without charge. Please pick up a UCSB COVID-19 test kit at Loma Pelona any weekday starting 1/3/2022 between 8:30 am and 4:45 pm. You will then use the kit to provide your saliva sample (at home or at some other convenient location for you) and return it to Loma Pelona at your appointment time, which must be within 24 hours of making the sample. Appointments can be made through the [https://t.e2ma.net/click/bmsprf/bafvpn/7yzgiy Student Health Patient Portal].


PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH
* Booster vaccines are required for all eligible staff, faculty, and students, as part of [https://t.e2ma.net/click/bmsprf/bafvpn/3j1giy UC’s SARS-CoV-2 Vaccine Program policy], in order to access UC facilities. Individuals with previously approved medical or religious exemptions are also exempt from booster requirements.


//[[User:John_d|Demis D. John]] 16:55, 24 November 2024 (UTC)
* Booster doses are widely available at pharmacies and medical clinics. Boosters will also be [https://t.e2ma.net/click/bmsprf/bafvpn/jc2giy available in Isla Vista from the Santa Barbara County Department of Public Health] at Embarcadero Hall January 10 - 28 on weekdays from 9 am - 5 pm, with appointments available through the [https://t.e2ma.net/click/bmsprf/bafvpn/z42giy MyTurn system].
: Influenza vaccinations are also required, unless you attest that you have read the educational information and decline, AND agree to mask through the end of flu season.


=====New Gowns in Jan=====
* The campus mask mandate does not distinguish “shared” or “public” spaces from other locations. All indoor spaces on campus, including research spaces, are subject to the masking requirement, with the exception of individual residences in campus housing, dining halls while eating, or individual offices with one person with the door closed.
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use.
: Everyone is encouraged to wear a mask outdoors in crowded settings when on campus.
// [[User:John_d|Demis D. John]] 16:58, 24 November 2024 (UTC)


=====Suss SB6-8E=====
// [[User:John d|John d]] 12:33, 3 January 2022 (PST)
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.


-Aidan
===== New EBL Rates =====
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:


=====ICP1 Down=====
Industrial Users: $405/hour
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)


=====Lab Access Changes: Symmetry App=====
UC Academic Users: $126/hour
The iris scanner has been decommissioned. Please use the card reader which supports:


-Physical card
Non-UC Academic Users: $150/hour


-Mobile phone via Symmetry App
UCSB CNSI Incubator USers: $260/hour


//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST)
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)


<!--
===== January GCA Vendor Service =====
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
The vendor will be here starting Monday January 17, 2022 at 8:00am to service the Autosep. The stage will be removed, so the machine will not be available for use in the evening. Service will conclude Wednesday January 19, 2022 at 5:00pm. Please schedule your process accordingly.
In order for your post to show up correctly, you need to:

>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
The vendor will be here to service the 6300-stepper starting Thursday January 20, 2022 at 8am. The system should be available by 5pm the same day. Please schedule your process accordingly.
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
[[User:Silva|Silva]] 09:14, 21 December 2021 (PST)
-->

<!---------DO NOT EDIT BELOW THIS LINE----------->
===== New COVID Protocols =====
All facility users and visitors are now required to have masks on while indoors in shared spaces. This includes shared offices, hallways/corridors, and all shared laboratory spaces. Masks will be worn in all laboratories at all times and in all shared office spaces at all times.

Surgical style masks or KN95 masks are appropriate for cleanroom use. Cloth masks may be used in non-cleanroom spaces.

This direction applies to all vaccinated and non-vaccinated persons. Outdoor policies remain unchanged.

See the full policies at '''[[COVID-19_User_Policies]]'''

// [[User:Hopkins a|Hopkins a]] 08:14, 6 August 2021 (PDT)



<!---------- end of Equipment Status ------------>
<!---------------------------------------------->
<endfeed />
<endfeed />
<noinclude>[[Category:Templates]]</noinclude>
<noinclude>[[Category:Templates]]</noinclude>
<!--------------------------------------------
<!--------------------------------------------
====== HOW TO ADD ITEMS ======




====== HOW TO ADD NEWS ITEMS ======

* You can copy/paste the example below for a new news item.
* You can copy/paste the example below for a new news item.
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
* Please use "There are no announcements at this time." if the announcements are empty.
* Please use "There are no announcements at this time." if the announcements are empty.


* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss




Line 88: Line 60:
===== NanoFab making LN2 icecream =====
===== NanoFab making LN2 icecream =====
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
// ~~~~


************* (end of example) **************
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
---------------------------------------------->
---------------------------------------------->

Latest revision as of 16:58, 24 November 2024

Lab Shutdown: Dec 26 to Jan 3rd

We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.

During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.

PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH

//Demis D. John 16:55, 24 November 2024 (UTC)

New Gowns in Jan

We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. // Demis D. John 16:58, 24 November 2024 (UTC)

Suss SB6-8E

When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.

-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)