Template:Announcements: Difference between revisions
(added Lee's MJB service) |
|||
(406 intermediate revisions by 7 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
<!--feedBurner name="UCSBNanofab-Announcements" /--> |
|||
<!-- Description of the RSS feed --> |
|||
'''''Important Announcements''''' |
|||
⚫ | |||
<!-- |
|||
⚫ | |||
=====Lab Shutdown: Dec 26 to Jan 3rd===== |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
<!------------- Equipment Status ----------------> |
|||
We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed. |
|||
===== MJB Contact Aligner Service ===== |
|||
The IR aligner will be unavailable on Tuesday April 5th from 8 am to around 5 pm and the non-IR aligner will be unavailable on Wednesday April 6th from 8 am to around 1pm. |
|||
⚫ | |||
During the shutdown this year we will be pulling all cleanroom suits and stocking new suits. |
|||
⚫ | |||
Please read the linked letter below (on Wiki) regarding masking policy changes, effective Saturday, March 19. |
|||
PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH |
|||
The nanofab will follow this policy with masks being optional for everyone in all sections of the facility beginning March 19. |
|||
⚫ | |||
All users must adhere to the campus policies as outlined in the letter from Chancellor Yang, including testing where required. |
|||
⚫ | |||
Link: [https://t.e2ma.net/message/opq87n/0equghb March 16th 2022- Letter from Office of the Chancellor] |
|||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. |
|||
⚫ | |||
=====Suss SB6-8E===== |
|||
See the full policies at '''[[COVID-19_User_Policies]]''' |
|||
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed. |
|||
⚫ | |||
-Aidan |
|||
===== GCA Stepper Service ===== |
|||
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT) |
|||
The GCA 6300 will be down for service starting at 8:00am April 19, 2022 until April 20, 2022 at 6:00pm. |
|||
=====ICP1 Down===== |
|||
The Autostep 200 will be down for service from 8:00am to 6:00pm Thursday April 21, 2022 and 8:00am to 6:00pm Friday April 22, 2022. Please plan your processes accordingly. |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
// 14:09, 23 March 2022 (PDT) |
|||
⚫ | |||
===== |
=====Lab Access Changes: Symmetry App===== |
||
The iris scanner has been decommissioned. Please use the card reader which supports: |
|||
LEXT Confocal microscope is down, please check email for updates. |
|||
⚫ | |||
-Physical card |
|||
⚫ | |||
The DUV camera on the DUV Microscope has failed, and can not be replaced/repaired. The microscope is up as a digital visible microscope only. |
|||
⚫ | |||
-Mobile phone via Symmetry App |
|||
===== New EBL Rates ===== |
|||
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows: |
|||
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
|||
Industrial Users: $405/hour |
|||
⚫ | |||
UC Academic Users: $126/hour |
|||
⚫ | |||
⚫ | |||
Non-UC Academic Users: $150/hour |
|||
⚫ | |||
⚫ | |||
UCSB CNSI Incubator USers: $260/hour |
|||
⚫ | |||
⚫ | |||
//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST) |
|||
<!---------- end of Equipment Status ------------> |
|||
<!----------------------------------------------> |
|||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
<!-------------------------------------------- |
<!-------------------------------------------- |
||
⚫ | |||
====== HOW TO ADD NEWS ITEMS ====== |
|||
* You can copy/paste the example below for a new news item. |
* You can copy/paste the example below for a new news item. |
||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
* You must add a user signature at the end of each post via four tildes: |
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
||
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
||
Line 83: | Line 60: | ||
===== NanoFab making LN2 icecream ===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
⚫ | |||
// ~~~~ |
|||
************* (end of example) ************** |
************* (end of example) ************** |
||
The |
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
||
----------------------------------------------> |
----------------------------------------------> |
Latest revision as of 16:58, 24 November 2024
Lab Shutdown: Dec 26 to Jan 3rd
We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.
During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.
PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH
//Demis D. John 16:55, 24 November 2024 (UTC)
New Gowns in Jan
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. // Demis D. John 16:58, 24 November 2024 (UTC)
Suss SB6-8E
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)