Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
mNo edit summary
 
(383 intermediate revisions by 7 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />
<!--feedBurner name="UCSBNanofab-Announcements" /-->
<!-- Description of the RSS feed -->
'''''Important Announcements'''''
----
<!--
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.


=====Lab Shutdown: Dec 26 to Jan 3rd=====
In order for your post to show up correctly, you need to:
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
-->
<!---------------------------------------------->
<!------------- Equipment Status ---------------->


We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.
===== NanoFab CLOSED: Wed June 1, 6-9am =====
'''The cleanroom will be closed to users from 6am to 9am on Wed June 1st,''' to allow Campus facilities to perform yearly emergency generator testing.


During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.
We will send out an email once the lab is safe to enter.


PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH
Please plan accordingly.
// [[User:John d|John d]] 12:14, 24 May 2022 (PDT)


//[[User:John_d|Demis D. John]] 16:55, 24 November 2024 (UTC)
===== Unaxis-Dep: Down =====
Deuterated Silane (SiD4) is out. Expected bottle delivery week of May 30th.
// [[User:John d|John d]] 09:28, 25 May 2022 (PDT)


===== AFM: UP =====
=====New Gowns in Jan=====
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use.
[[Atomic_Force_Microscope_(Bruker_ICON)|AFM]] head repaired. If you find that a pin is bent, or off axis, then STOP and immediately contact [[Bill Mitchell]]. Under no circumstances should you try to fix yourself.
// [[User:John d|John d]] 21:12, 19 May 2022 (PDT)
// [[User:John_d|Demis D. John]] 16:58, 24 November 2024 (UTC)


===== F50 UP =====
=====Suss SB6-8E=====
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
The [[Optical_Film_Thickness_%26_Wafer-Mapping_(Filmetrics_F50)|Filmetrics F50 Wafer Mapper]] is repaired and up.


-Aidan
Tool has been relocated to Bay 7, just before the EBL room.
// [[User:John d|John d]] 07:24, 10 May 2022 (PDT)
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)


===== New COVID protocols =====
=====ICP1 Down=====
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
Please read the linked letter below (on Wiki) regarding masking policy changes, effective Saturday, March 19.
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)


=====Lab Access Changes: Symmetry App=====
The nanofab will follow this policy with masks being optional for everyone in all sections of the facility beginning March 19.
The iris scanner has been decommissioned. Please use the card reader which supports:


-Physical card
All users must adhere to the campus policies as outlined in the letter from Chancellor Yang, including testing where required.


-Mobile phone via Symmetry App
Link: [https://t.e2ma.net/message/opq87n/0equghb March 16th 2022- Letter from Office of the Chancellor]


//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
See the full policies at '''[[COVID-19_User_Policies]]'''
// [[User:John d|John d]] 16:08, 21 March 2022 (PDT)


<!--
===== New EBL Rates =====
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
In order for your post to show up correctly, you need to:

>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
Industrial Users: $405/hour
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~

-->
UC Academic Users: $126/hour
<!---------DO NOT EDIT BELOW THIS LINE----------->

Non-UC Academic Users: $150/hour

UCSB CNSI Incubator USers: $260/hour

//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST)

<!---------- end of Equipment Status ------------>
<!---------------------------------------------->
<endfeed />
<endfeed />
<noinclude>[[Category:Templates]]</noinclude>
<noinclude>[[Category:Templates]]</noinclude>
<!--------------------------------------------
<!--------------------------------------------
====== HOW TO ADD ITEMS ======




====== HOW TO ADD NEWS ITEMS ======

* You can copy/paste the example below for a new news item.
* You can copy/paste the example below for a new news item.
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
Line 87: Line 60:
===== NanoFab making LN2 icecream =====
===== NanoFab making LN2 icecream =====
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
// ~~~~


************* (end of example) **************
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
---------------------------------------------->
---------------------------------------------->

Latest revision as of 16:58, 24 November 2024

Lab Shutdown: Dec 26 to Jan 3rd

We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.

During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.

PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH

//Demis D. John 16:55, 24 November 2024 (UTC)

New Gowns in Jan

We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. // Demis D. John 16:58, 24 November 2024 (UTC)

Suss SB6-8E

When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.

-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)