Difference between revisions of "Template:Announcements"
(Cl2 repair) |
Mehalana v (talk | contribs) |
||
(278 intermediate revisions by 7 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
+ | =====MLA Maintenance 6/24-6/27===== |
||
− | <!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
+ | The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the |
||
− | <!-- Description of the RSS feed --> |
||
+ | evenings. |
||
− | '''''Important Announcements''''' |
||
− | - |
+ | -Lee |
+ | //15:59, 4 June 2024 (PDT) |
||
− | <!-- |
||
− | SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
+ | =====EBeam4 is up===== |
||
− | In order for your post to show up correctly, you need to: |
||
+ | EBeam4 is back up. |
||
− | >> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
||
− | >> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
− | --> |
||
− | <!----------------------------------------------> |
||
− | <!------------- Equipment Status ----------------> |
||
+ | The overnight regen of the cryo was completed this morning. |
||
− | ===== Chlorine gasses available ===== |
||
+ | I then tested the operation of the hoist numerous times without issue. |
||
− | All CL2 processes are now available for your use. |
||
+ | I tested the EBeam by running 200A of Ti without issue. |
||
+ | System UP |
||
− | // [[User:John d|John d]] 10:57, 31 August 2022 (PDT) |
||
+ | //10:36, 30 May 2024 (PDT) |
||
− | ===== ASML Up; Network status ===== |
||
+ | =====Stepper #1 (GCA 6300) - Tool availability===== |
||
− | We are running a newer computer; |
||
+ | Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times: |
||
− | Nanofiles sync & JobCreator functionality will be restored in the next few weeks. |
||
+ | 6-18-24 at 8:00am |
||
− | // [[User:John d|John d]] 09:00, 22 July 2022 (PDT) |
||
+ | Till |
||
+ | 6-20-24 at 5:00pm |
||
+ | Please plan your processing activities accordingly. |
||
− | ===== Face-Masks Optional as of June 13 ===== |
||
+ | //13:32, 1 June 2024 (PDT) |
||
− | You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired. |
||
+ | =====Stepper #2 (GCA Autostep 200) - Tool availability===== |
||
− | We will still provide masks at the metal table in front of the cleanroom entry. |
||
+ | Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times: |
||
− | See the [https://t.e2ma.net/webview/be2nag/25634e9f535619ce1f4eb976598e7268 UCSB announcement at this link]. |
||
+ | 6-21-24 at 8:00am |
||
− | See the full policies at '''[[COVID-19_User_Policies]]''' |
||
+ | Till |
||
− | // [[User:John d|John d]] 11:20, 13 June 2022 (PDT) |
||
+ | 6-21-24 at 5:00pm |
||
+ | Please plan your processing activities accordingly. |
||
− | ===== New EBL Rates ===== |
||
− | Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows: |
||
+ | Thanks |
||
− | Industrial Users: $405/hour |
||
+ | Bill Millerski |
||
+ | UCSB |
||
+ | //13:32, 1 June 2024 (PDT) |
||
+ | =====Stepper #3 (ASML DUV) - System UP and calibrated===== |
||
− | UC Academic Users: $126/hour |
||
+ | We have finished calibrations, |
||
+ | System is up. |
||
+ | Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose. |
||
− | Non-UC Academic Users: $150/hour |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT) |
||
+ | =====Unaxis VLR still Down===== |
||
− | UCSB CNSI Incubator USers: $260/hour |
||
+ | The chiller has a decent sized ball of ice inside of it. |
||
− | //[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST) |
||
+ | I need to let that melt off before I can do a proper diagnosis of what is causing the high pressure cut off to trip when the refrigerant pressures seem normal. |
||
− | <!---------- end of Equipment Status ------------> |
||
+ | //13:29, 1 June 2024 (PDT) |
||
− | <!----------------------------------------------> |
||
− | <endfeed /> |
||
− | <noinclude>[[Category:Templates]]</noinclude> |
||
− | <!-------------------------------------------- |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT) |
||
+ | =====Atomic Force Microscope (Dimension ICON) - 05/17: System UP===== |
||
+ | Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder! |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 13:46, 20 May 2024 (PDT) |
||
− | ===== |
+ | =====MA6 TSA is down - Update===== |
+ | Due to unforeseen circumstances our FSE will not be onsite next week to work on the TSA microscope. They have rescheduled with us for Thursday of the following week, 6/13. I apologize for the inconvenience. |
||
+ | Per my previous email, there is a MA6 available for use at CNSI. Here is a link to the webpage for their tools: |
||
+ | |||
+ | https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication |
||
+ | |||
+ | -Lee |
||
+ | //15:59, 22 May 2024 (PDT) |
||
+ | |||
+ | =====Velion FIB Tool DOWN===== |
||
+ | Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice. |
||
+ | |||
+ | //[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT) |
||
+ | |||
+ | =====ICP1 Down===== |
||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
+ | |||
+ | =====Lab Access Changes: Symmetry App===== |
||
+ | The iris scanner has been decommissioned. Please use the card reader which supports: |
||
+ | |||
+ | -Physical card |
||
+ | |||
+ | -Mobile phone via Symmetry App |
||
+ | |||
+ | //10:54, 23 May 2024 (PDT) |
||
+ | |||
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
||
+ | |||
+ | <!-- |
||
+ | SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
+ | In order for your post to show up correctly, you need to: |
||
+ | >> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
||
+ | >> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
+ | --> |
||
+ | <!---------DO NOT EDIT BELOW THIS LINE-----------> |
||
+ | <endfeed /> |
||
+ | <noinclude>[[Category:Templates]]</noinclude> |
||
+ | <!-------------------------------------------- |
||
+ | ====== HOW TO ADD ITEMS ====== |
||
* You can copy/paste the example below for a new news item. |
* You can copy/paste the example below for a new news item. |
||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
− | * You must add a user signature at the end of each post via four tildes: |
+ | * You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
||
Line 74: | Line 120: | ||
===== NanoFab making LN2 icecream ===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
+ | // [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) |
||
− | // ~~~~ |
||
************* (end of example) ************** |
************* (end of example) ************** |
||
− | The |
+ | The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
----------------------------------------------> |
----------------------------------------------> |
Latest revision as of 15:59, 4 June 2024
MLA Maintenance 6/24-6/27
The MLA will be receiving its biannual service the week of June 24. The work will be performed from Monday 6/24 through Thursday 6/27. They plan to have the work completed in 3 days but want to have the 4th day available if needed. The tool will very likely be unavailable overnight Monday but should be available the rest of the evenings. -Lee //15:59, 4 June 2024 (PDT)
EBeam4 is up
EBeam4 is back up.
The overnight regen of the cryo was completed this morning. I then tested the operation of the hoist numerous times without issue. I tested the EBeam by running 200A of Ti without issue.
System UP
//10:36, 30 May 2024 (PDT)
Stepper #1 (GCA 6300) - Tool availability
Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:
6-18-24 at 8:00am Till 6-20-24 at 5:00pm
Please plan your processing activities accordingly. //13:32, 1 June 2024 (PDT)
Stepper #2 (GCA Autostep 200) - Tool availability
Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:
6-21-24 at 8:00am Till 6-21-24 at 5:00pm
Please plan your processing activities accordingly.
Thanks Bill Millerski UCSB //13:32, 1 June 2024 (PDT)
Stepper #3 (ASML DUV) - System UP and calibrated
We have finished calibrations, System is up.
Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose. //Vraj Mehalana 11:17, 24 May 2024 (PDT)
Unaxis VLR still Down
The chiller has a decent sized ball of ice inside of it.
I need to let that melt off before I can do a proper diagnosis of what is causing the high pressure cut off to trip when the refrigerant pressures seem normal. //13:29, 1 June 2024 (PDT)
//Vraj Mehalana 11:17, 24 May 2024 (PDT)
Atomic Force Microscope (Dimension ICON) - 05/17: System UP
Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!
//Vraj Mehalana 13:46, 20 May 2024 (PDT)
MA6 TSA is down - Update
Due to unforeseen circumstances our FSE will not be onsite next week to work on the TSA microscope. They have rescheduled with us for Thursday of the following week, 6/13. I apologize for the inconvenience.
Per my previous email, there is a MA6 available for use at CNSI. Here is a link to the webpage for their tools:
https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication
-Lee //15:59, 22 May 2024 (PDT)
Velion FIB Tool DOWN
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
//Vraj Mehalana 10:58, 30 April 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//10:54, 23 May 2024 (PDT)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)