Template:Announcements: Difference between revisions
(SEM#1 UP) |
|||
(336 intermediate revisions by 7 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
<!--feedBurner name="UCSBNanofab-Announcements" /--> |
|||
<!-- Description of the RSS feed --> |
|||
'''''Important Announcements''''' |
|||
⚫ | |||
<!-- |
|||
⚫ | |||
=====Lab Shutdown: Dec 26 to Jan 3rd===== |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
<!------------- Equipment Status ----------------> |
|||
We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed. |
|||
===== SEM#1 (FEI): UP ===== |
|||
The field service engineer has finished with the alignments and the system is ready to use. |
|||
// [[User:John d|John d]] 14:27, 21 September 2022 (PDT) |
|||
During the shutdown this year we will be pulling all cleanroom suits and stocking new suits. |
|||
===== GCA AutoStep Service ===== |
|||
Stepper #2 (GCA AutoStep200) will be unavailable for use while maintenance tasks are performed on the following dates: 9-26-22 8am to 9-27-22 5pm. |
|||
PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH |
|||
// [[User:John d|John d]] 08:30, 19 September 2022 (PDT) |
|||
//[[User:John_d|Demis D. John]] 16:55, 24 November 2024 (UTC) |
|||
===== GCA 6300 Service ===== |
|||
GCA 6300 will not be available for use while it is undergoing maintenance activities on 9-28-22 & 9-29-22. |
|||
=====New Gowns in Jan===== |
|||
// [[User:John d|John d]] 08:33, 19 September 2022 (PDT) |
|||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. |
|||
// [[User:John_d|Demis D. John]] 16:58, 24 November 2024 (UTC) |
|||
===== |
=====Suss SB6-8E===== |
||
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed. |
|||
-Aidan |
|||
The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. |
|||
// |
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT) |
||
===== |
=====ICP1 Down===== |
||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
|||
=====Lab Access Changes: Symmetry App===== |
|||
Nanofiles sync & JobCreator functionality is in the process of being restored. |
|||
The iris scanner has been decommissioned. Please use the card reader which supports: |
|||
Batch_Reports are now syncing. JobCreator is working but local scripts are still being written + tested. |
|||
-Physical card |
|||
// [[User:John d|John d]] 01:53, 17 September 2022 (PDT) |
|||
-Mobile phone via Symmetry App |
|||
<!---------- end of Equipment Status ------------> |
|||
<!----------------------------------------------> |
|||
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
<!-------------------------------------------- |
<!-------------------------------------------- |
||
⚫ | |||
⚫ | |||
* You can copy/paste the example below for a new news item. |
* You can copy/paste the example below for a new news item. |
||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
* You must add a user signature at the end of each post via four tildes: |
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
||
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
||
Line 66: | Line 60: | ||
===== NanoFab making LN2 icecream ===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) |
|||
// ~~~~ |
|||
************* (end of example) ************** |
************* (end of example) ************** |
||
The |
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
||
----------------------------------------------> |
----------------------------------------------> |
Latest revision as of 16:58, 24 November 2024
Lab Shutdown: Dec 26 to Jan 3rd
We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.
During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.
PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH
//Demis D. John 16:55, 24 November 2024 (UTC)
New Gowns in Jan
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. // Demis D. John 16:58, 24 November 2024 (UTC)
Suss SB6-8E
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)